Line and Grade. 1. The Work shall conform to the lines, elevations, and grades shown on the Plans. Three consecutive points set on the same slope shall be used together so that any variation from a straight grade can be detected. Any such variation shall be reported to the City’s PM. In the absence of such report, the Surveyor shall be responsible for any error in the grade of the Work. 2. Grades for underground conduits will be set at the surface of the ground. The Design-Builder shall transfer them to the bottom of the trench.
Appears in 2 contracts
Sources: Sole Source Agreement, Sole Source Agreement