LNG AND GAS SPECIFICATION Clause Samples

LNG AND GAS SPECIFICATION. 16.1 The Customer shall contract so that any LNG delivered at the LNG Transfer Point shall comply with the LNG Specification set out in part A of Appendix B. 16.2 The Contractor warrants that any Regasified LNG delivered at the Delivery Point shall comply with the Natural Gas Specification set out in part B of Appendix B; PROVIDED THAT (i) all LNG delivered at the LNG Transfer Point complies with the LNG Specification set out in part A of Appendix B and (ii) the Customer complies with this clause 16; and PROVIDED FURTHER THAT (i) the Contractor shall have no liability under this clause 16.2, in respect of any matter that is not directly caused by the Contractor’s breach of this Agreement or the Owner’s default under the Bareboat Charter and (ii) the Contractor’s liability under this clause 16.2, Regardless of Cause, shall be limited as set forth in this clause 16.

Related to LNG AND GAS SPECIFICATION

  • DAF Specifications Developer shall submit initial specifications for the DAF, including System Protection Facilities, to Connecting Transmission Owner and NYISO at least one hundred eighty (180) Calendar Days prior to the Initial Synchronization Date; and final specifications for review and comment at least ninety (90) Calendar Days prior to the Initial Synchronization Date. Connecting Transmission Owner and NYISO shall review such specifications to ensure that the DAF are compatible with the technical specifications, operational control, and safety requirements of the Connecting Transmission Owner and NYISO and comment on such specifications within thirty (30) Calendar Days of Developer’s submission. All specifications provided hereunder shall be deemed to be Confidential Information.

  • Escrow Format Specification Deposit’s Format. Registry objects, such as domains, contacts, name servers, registrars, etc. will be compiled into a file constructed as described in draft-▇▇▇▇▇-▇▇▇▇▇▇▇-registry-data-escrow, see Part A, Section 9, reference 1 of this Specification and draft-▇▇▇▇▇-▇▇▇▇▇▇▇-dnrd-objects-mapping, see Part A, Section 9, reference 2 of this Specification (collectively, the “DNDE Specification”). The DNDE Specification describes some elements as optional; Registry Operator will include those elements in the Deposits if they are available. If not already an RFC, Registry Operator will use the most recent draft version of the DNDE Specification available at the Effective Date. Registry Operator may at its election use newer versions of the DNDE Specification after the Effective Date. Once the DNDE Specification is published as an RFC, Registry Operator will implement that version of the DNDE Specification, no later than one hundred eighty (180) calendar days after. UTF-8 character encoding will be used.

  • The Specifications The Specifications are that portion of the Contract Documents consisting of the written requirements for materials, equipment, systems, standards and workmanship for the Work, and performance of related services.

  • General specifications For the purpose of this Regulation, the vehicle shall fulfil the following requirements:

  • Technical Specifications The purpose of the Technical Specifications (TS), is to define the technical characteristics of the Goods and Related Services required by the Procuring Entity. The Procuring Entity shall prepare the detailed TS consider that: