Load and Equipment Limits. Tenant shall not place a load upon any floor of the Premises which exceeds the load per square foot which such floor was designed to carry as determined by Landlord or Landlord's structural engineer. The cost of any such determination made by Landlord's structural engineer in
Appears in 2 contracts
Sources: Office Lease (JCM Partners LLC), Office Lease (JCM Partners LLC)
Load and Equipment Limits. Tenant shall not place a load upon any floor of the Premises which exceeds the load per square foot which such floor was designed to carry as determined by Landlord or Landlord's ’s structural engineer. The cost of any such determination made by Landlord's ’s structural engineer inin connection with Tenant’s occupancy shall be paid by Tenant upon Landlord’s demand.
Appears in 1 contract
Sources: Lease Agreement (Integrated Alarm Services Group Inc)