Common use of LOAD TESTING Clause in Contracts

LOAD TESTING. LOAD TEST OF STRUCTURAL CONCRETE. 1 In case of doubts regarding grade of concrete used either due to poor workmanship or based on results of cube strength tests, the load testing of any part of the structure will have to be carried out by the Contractor at his own cost.

Appears in 4 contracts

Sources: Construction Contract, Construction Contract, Construction Contract

LOAD TESTING. LOAD TEST OF STRUCTURAL CONCRETE. 1 In case of doubts regarding grade of concrete used either due to poor workmanship or based on results of cube strength tests, the load testing of any part of the structure will have to be carried out by the Contractor at his own cost. 2. Before carrying out load test, the Contractor shall carryout the suitable non destructive testing of the structure which are in doubt, at his own cost. Non destructive testing is fully optional and at the discretion of the Contractor.

Appears in 2 contracts

Sources: Construction Contract, Construction Contract

LOAD TESTING. LOAD TEST OF STRUCTURAL CONCRETE1. 1 In case of doubts regarding grade of concrete used either due to poor workmanship or based on results of cube strength tests, the load testing of any part of the structure will have to be carried out by the Contractor at his own cost. 2. Before carrying out load test, the Contractor shall carryout the suitable non destructive testing of the structure which are in doubt, at his own cost. Non destructive testing is fully optional and at the discretion of the Contractor.

Appears in 2 contracts

Sources: Contract Agreement, Construction Contract

LOAD TESTING. LOAD TEST OF STRUCTURAL CONCRETE1. 1 In case of doubts regarding grade of concrete used either due to poor workmanship or based on results of cube strength tests, the load testing of any part of the structure will have to be carried out by the Contractor at his own cost. 2. Before carrying out load test, the Contractor shall carryout the suitable non destructive testing of the structure which is in doubt, at his own cost. Non destructive testing is fully optional and at the discretion of the Contractor.

Appears in 1 contract

Sources: Tender Agreement