LOAD TICKETS. 3.1. Load Tickets shall be used for recording the cubic yard volume [or each for stumps] of debris removed for disposal. Load tickets shall be provided by the [County] [City] [State]. A copy of the load ticket to be used by the contractor shall be submitted for [COR] [City] [County] [State] approval prior to beginning work. [The Contractor shall provide all load tickets to the [City] [County] [State].] The load ticket numbers shall be sequentially numbered. The load tickets shall be a minimum of four-parts. A sample load ticket is included as an attachment. 3.2. Each ticket shall contain the following information: • Ticket Number • Contract Number • Contractor Name • Date • Truck or Roll-off Number • Truck Capacity • Point of Debris Collection • Loading Departure Time • Dump Arrival Time • Percent of Load • Actual Debris Volume • Debris Eligibility (Y/N)
Appears in 2 contracts
LOAD TICKETS. 3.1. Load Tickets shall be used for recording the cubic yard volume [or each for stumps] of debris removed for disposal. Load tickets shall be provided by the [County] [City] [State]. A copy of the load ticket to be used by the contractor shall be submitted for [COR] [City] [County] [State] approval prior to beginning work. [The Contractor shall provide all load tickets to the [City] [County] [State].] The load ticket numbers shall be sequentially numbered. The load tickets shall be a minimum of four-parts. A sample load ticket is included as an attachment.attachment.
3.2. Each ticket shall contain the following information: • Ticket Number • Contract Number • Contractor Name • Date • Truck or Roll-off Number • Truck Capacity • Point of Debris Collection • Loading Departure Time • Dump Arrival Time • Percent of Load • Actual Debris Volume • Debris Eligibility (Y/N)
Appears in 1 contract
Sources: Debris Removal Contract