Long-Term Energy Modeling and Forecasting Sample Clauses

The Long-Term Energy Modeling and Forecasting clause establishes the requirement for parties to use predictive models and analytical tools to estimate future energy needs, consumption patterns, and supply capabilities over an extended period. Typically, this involves setting out the methodologies, data sources, and assumptions to be used in creating forecasts, and may require regular updates or reviews as new information becomes available. The core function of this clause is to ensure informed decision-making and strategic planning by providing a structured approach to anticipating future energy demands and mitigating associated risks.
Long-Term Energy Modeling and Forecasting. The energy sector uses long-term (1 to 20 years) energy forecasting to plan for and develop electricity generation to meet long-term demand. Long-term forecasting includes everything from planning by utilities for expanding production over a 1- to 10-year period to long-term scenario analysis useful for setting regional and national energy policy. Long-term energy forecasting and scenario models use inputs such as historical and projected loads, average meteorological and climate data, available energy sources, resource availability, environmental impacts, and economic data. In other cases, individual models are linked or reconciled in an integrated assessment model that brings together a broader set of areas, methods, styles of study, or degrees of certainty, than would typically characterize a study of the same issue within the bounds of a single research discipline. ▪ Meteorology data ▪ Climate models ▪ Renewable energy resources, such as solar radiation and wind sources, and expected changes to those resources due to long-term climate changes With climate change uncertainty and rapidly growing energy needs, the need for better and relevant data for long-term energy models is significant. A variety of government, non-profit organizations, and private companies conduct long-term energy forecasting to meet their own or support others’ specific decision-making needs. For example, the Energy Information Administration (EIA), an independent agency within DOE, designed and implements the National Energy Modeling System (NEMS).93 This computer-based, energy-economy modeling system of U.S. energy markets for the midterm period through 2025 is used by EIA to project the energy, economic, environmental, and security impacts on the U.S. of alternative energy policies and different assumptions about energy markets. The model relies on input data such as economic information but does not (and cannot in the current model) incorporate direct and future environmental data. For example, the NEMS model does not have a relationship between load and temperature, and thus cannot use such data as long-term temperature and atmospheric changes as an input. In addition, EIA’s System for Analysis of Global Energy Markets (SAGE) is an integrated set of regional models that provides a technology-rich basis for estimating regional energy supply and demand.94 As another example, the IEA Energy Technology Systems Analysis Programme developed the MARKAL generic model as part of a coop...

Related to Long-Term Energy Modeling and Forecasting

  • COUNTY’S QUALITY ASSURANCE PLAN The County or its agent will evaluate the Contractor’s performance under this Contract on not less than an annual basis. Such evaluation will include assessing the Contractor’s compliance with all Contract terms and conditions and performance standards. Contractor deficiencies which the County determines are severe or continuing and that may place performance of the Contract in jeopardy if not corrected will be reported to the Board of Supervisors. The report will include improvement/corrective action measures taken by the County and the Contractor. If improvement does not occur consistent with the corrective action measures, the County may terminate this Contract or impose other penalties as specified in this Contract.

  • Quality Assurance/Quality Control Contractor shall establish and maintain a quality assurance/quality control program which shall include procedures for continuous control of all construction and comprehensive inspection and testing of all items of Work, including any Work performed by Subcontractors, so as to ensure complete conformance to the Contract with respect to materials, workmanship, construction, finish, functional performance, and identification. The program established by Contractor shall comply with any quality assurance/quality control requirements incorporated in the Contract.

  • Data Quality 4.1 Each party ensures that the shared Personal Data is accurate. 4.2 Parties will notify each other with undue delay if they become aware of inaccuracies in shared Personal Data.

  • COVID-19 Employees of Contractor and/or persons working on its behalf, including, but not limited to, subcontractors (collectively, “Contractor Personnel”), while performing services under this Agreement and prior to interacting in person with City employees, contractors, volunteers, or members of the public (collectively, “In-Person Services”) must be fully vaccinated against the novel coronavirus 2019 (“COVID-19”). “Fully vaccinated” means that 14 or more days have passed since Contractor Personnel have received the final dose of a two-dose COVID-19 vaccine series (Moderna or Pfizer-BioNTech) or a single dose of a one-dose COVID-19 vaccine (▇▇▇▇▇▇▇ & ▇▇▇▇▇▇▇/▇▇▇▇▇▇▇) and all booster doses recommended by the Centers for Disease Control and Prevention. Prior to assigning Contractor Personnel to perform In-Person Services, Contractor shall obtain proof that such Contractor Personnel have been fully vaccinated. Contractor shall retain such proof for the document retention period set forth in this Agreement. Contractor shall grant medical or religious exemptions (“Exemptions”) to Contractor Personnel as required by law. If Contractor wishes to assign Contractor Personnel with Exemptions to perform In- Person Services, Contractor shall require such Contractor Personnel to undergo weekly COVID-19 testing, with the full cost of testing to be borne by Contractor. If Contractor Personnel test positive, they shall not be assigned to perform In-Person Services or, to the extent they have already been performing In-Person Services, shall be immediately removed from those assignments. Furthermore, Contractor shall immediately notify City if Contractor Personnel performing In-Person Services (1) have tested positive for or have been diagnosed with COVID-19, (2) have been informed by a medical professional that they are likely to have COVID-19, or (3) meet the criteria for isolation under applicable government orders.

  • Money Market Fund Compliance Testing and Reporting Services Subject to the authorization and direction of the Trust and, in each case where appropriate, the review and comment by the Trust’s independent accountants and legal counsel, and in accordance with procedures that may be established from time to time between the Trust and the Administrator, the Administrator will: