Common use of Loop Testing/Trouble Reporting Clause in Contracts

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South will be responsible for testing and isolating troubles on the Loops. Comm South must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South will be required to provide the results of the Comm South test which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- ND, etc.) and no trouble actually exists, BellSouth will charge Comm South for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South for any dispatch and testing outside the central office.

Appears in 2 contracts

Sources: Clec Agreement, Clec Agreement

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South will be <<customer_name>> is responsible for testing and isolating troubles on the Loops. Comm South <<customer_name>> must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South <<customer_name>> will be required to provide the results of the Comm South <<customer_name>> test which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South <<customer_name>> has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South <<customer_name>> reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- UCL-ND, etc.) and no trouble actually exists, BellSouth will charge Comm South <<customer_name>> for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South for any dispatch and testing outside the central office.

Appears in 2 contracts

Sources: Interconnection Agreement, Interconnection Agreement

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South NAS will be responsible for testing and isolating troubles on the Loops. Comm South NAS must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South NAS will be required to provide the results of the Comm South test NAS tests which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South NAS has isolated a trouble to the BellSouth provided Loop, and had has issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South NAS reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- UCL-ND, etc.) and no trouble actually exists, BellSouth will charge Comm South NAS for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South NAS reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South NAS for any dispatch and testing outside the central office.

Appears in 1 contract

Sources: Clec Agreement

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South NTBS will be responsible for testing and isolating troubles on the Loops. Comm South NTBS must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South NTBS will be required to provide the results of the Comm South NTBS test which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South NTBS has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South NTBS reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- UCL-ND, etc.) and no trouble actually exists, BellSouth will charge Comm South NTBS for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South NTBS reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South NTBS for any dispatch and testing outside the central office.

Appears in 1 contract

Sources: Clec Agreement

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South Navigator will be responsible for testing and isolating troubles on the Loops. Comm South Navigator must test and isolate trouble to the BellSouth portion of a designed/non-non- designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South Navigator will be required to provide the results of the Comm South Navigator test which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South Navigator has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South Navigator reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- UCL-ND, etc.) and no trouble actually exists, BellSouth will charge Comm South Navigator for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South Navigator reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South Navigator for any dispatch and testing outside the central office.

Appears in 1 contract

Sources: Telecommunications

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South Oronoco will be responsible for testing and isolating troubles on the Loops. Comm South Oronoco must test and isolate trouble to the BellSouth portion of a designed/non-non- designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South Oronoco will be required to provide the results of the Comm South Oronoco test which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South Oronoco has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South Oronoco reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- UCL-ND, etc.) and no trouble actually exists, BellSouth ▇▇▇▇▇▇▇▇▇ will charge Comm South Oronoco for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South Oronoco reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South Oronoco for any dispatch and testing outside the central office.

Appears in 1 contract

Sources: Clec Agreement

Loop Testing/Trouble Reporting. 2.1.8.1 Comm South D-Tel, Inc. will be responsible for testing and isolating troubles on the Loops. Comm South D- Tel, Inc. must test and isolate trouble to the BellSouth portion of a designed/non-designed unbundled loop (e.g., UVL-SL2, UCL-D, UVL-SL1, UCL-ND, etc.) before reporting repair to the UNE Center. At the time of the trouble report, Comm South D-Tel, Inc. will be required to provide the results of the Comm South D-Tel, Inc. test which indicate a problem on the BellSouth provided loop. 2.1.8.2 Once Comm South D-Tel, Inc. has isolated a trouble to the BellSouth provided Loop, and had issued a trouble report to BellSouth on the Loop, BellSouth will take the actions necessary to repair the Loop if a trouble actually exists. BellSouth will repair these Loops in the same time frames that BellSouth repairs similarly situated Loops to its end users. 2.1.8.3 If Comm South D-Tel, Inc. reports a trouble on a non-designed loop (e.g., UVL-SL1, UCL- UCL-ND, etc.) and no trouble actually exists, BellSouth will charge Comm South D-Tel, Inc. for any dispatching and testing (both inside and outside the CO) required by BellSouth in order to confirm the loop’s working status. If Comm South D-Tel, Inc. reports trouble on a designed loop and no trouble is found, BellSouth will charge Comm South D-Tel, Inc. for any dispatch and testing outside the central office.

Appears in 1 contract

Sources: Interconnection Agreement