Contract Capacity The electric power producing capability of the Generating Facility which is committed to Edison.
SLEEPING CAPACITY/DISTURBANCES Tenant and all other occupants will be required to vacate the premises and forfeit the rental fee and security deposit for any of the following: Occupancy exceeding the sleeping capacity, using the premises for any illegal activity, causing damage to the premises rented or to any of the neighboring properties and any other acts which interfere with neighbors' right to quiet enjoyment of their premises. iTrip or the Owner, does not assume any liability for loss, damage or injury to persons or their personal property. Neither does the owner accept any liability for any inconveniences, damage, loss or injury arising from any temporary defects or stoppage in supply of water, gas, cable service, electricity or plumbing, as well as due to weather conditions, natural disasters, acts of God, or other reasons beyond its control. Tenant hereby acknowledges that the premises they have reserved may include a pool and the undersigned agrees and acknowledges that the pool and patio/deck can be dangerous areas, that the deck/patio can be slippery when wet, and that injury may occur to anyone who is not careful. With full knowledge of the above facts and warnings, the undersigned Tenant accepts and assumes all risks involved to Tenant and all of Tenant's guests in or related to the use of the community pool and patio areas.
Local Circuit Switching Capability, including Tandem Switching Capability 4.2.1 Local circuit switching capability is defined as all line-side and trunk-side facilities, plus the features, functions, and capabilities of the switch. The features, functions, and capabilities of the switch shall include the basic switching function of connecting lines to lines, lines to trunks, trunks to lines, and trunks to trunks. Local circuit switching includes all vertical features that the switch is capable of providing, including custom calling, custom local area signalling service features, and Centrex, as well as any technically feasible customized routing functions. 4.2.2 Notwithstanding BellSouth’s general duty to unbundle local circuit switching, BellSouth shall not be required to unbundle local circuit switching for ▇▇▇▇ when ▇▇▇▇: (1) serves an End User with four (4) or more voice-grade (DS0) equivalents or lines served by BellSouth in Zone 1 of one of the following MSAs: Atlanta, GA;
Under-Frequency and Over Frequency Conditions The New York State Transmission System is designed to automatically activate a load- shed program as required by the NPCC in the event of an under-frequency system disturbance. Developer shall implement under-frequency and over-frequency relay set points for the Large Generating Facility as required by the NPCC to ensure “ride through” capability of the New York State Transmission System. Large Generating Facility response to frequency deviations of predetermined magnitudes, both under-frequency and over-frequency deviations, shall be studied and coordinated with the NYISO and Connecting Transmission Owner in accordance with Good Utility Practice. The term “ride through” as used herein shall mean the ability of a Generating Facility to stay connected to and synchronized with the New York State Transmission System during system disturbances within a range of under-frequency and over-frequency conditions, in accordance with Good Utility Practice and with NPCC Regional Reliability Reference Directory # 12, or its successor.
Certification as Small Contractor or Minority Business Enterprise This paragraph was intentionally left blank.