Main Lobby Clause Samples

The 'Main Lobby' clause defines the specific area within a building designated as the primary entrance and reception space. This clause typically outlines the boundaries, permitted uses, and any restrictions or requirements for the main lobby, such as hours of access, maintenance responsibilities, or signage placement. By clearly identifying and regulating the main lobby, the clause ensures that both parties understand their rights and obligations regarding this central common area, helping to prevent disputes over its use and upkeep.
Main Lobby. Post 1 Security Personnel will be stationed in the main lobby of ▇▇▇▇ ▇▇▇▇ ▇▇▇ ▇▇▇▇▇▇, ▇▇▇▇▇▇, ▇▇▇▇▇, 7:30 a.m. to 5:30 p.m. Monday through Friday. On Saturdays and Sundays conduct internal and external control of property, monitor security systems, and issue parking violations as needed.
Main Lobby. 3D a. Clean walls with damp cloth and dust weekly. MONTHLY
Main Lobby a. Clean walls with damp cloth and dust weekly.
Main Lobby. The main lobby is a two-story atrium with a glass, 2-story glazed storefront entrance system that opens to the front plaza. The lobby stair will also have a steel and cable or glass handrail system.
Main Lobby. Daily: • Empty lobby trash receptacles as needed, but not less than four times per day. • Periodically clean lobby glass and entrance glass of fingerprints and smudges. • Carpet sweep walk-off mats as needed. • Spot clean chrome and bright work as needed. • Place and / or pick up walk-off mats as weather conditions require. Shampoo as required. Nightly: • Wet mop all flooring paying special attention to corners, edges, and baseboard. Remove all scuffs and stains. • Wipe clean and dust all visitor reception areas, including removal of any trash. Clean and sanitize all telephones. • Dust and clean lobby directory. • Dust and clean all walls from floor to 72” above floor. • Clean and polish all metal doors and bucks, handrails, revolving doors and drums of revolving doors, interior and exterior. • Wipe clean and polish all planters. • Wipe down and clean the security desk area and equipment. • Remove all finger marks, dirt smudges, graffiti, etc., from all revolving doors, frames, glass doors, partitions, windows, walls, elevator doors and elevator jambs. • Empty (clean and sanitize as needed) all waste receptacles. Remove wastepaper and waste materials to designated area. • Remove gum from walk-off mats and all other types of flooring. • Vacuum all walk-off mats. • Vacuum, clean and polish all floor saddles. • Clean and sanitize all public telephones and surrounding area. • Dust all flat surfaces including furniture. • Place and / or pick up walk-off mats as weather conditions require. Weekly: • Dust all low reach areas including, but not limited to, chair rungs, structural and furniture ledges, baseboards, window ▇▇▇▇▇, door louvers, moldings, etc. • Dust all fire extinguishers cabinets or enclosures, enunciator panels and pull stations. • Sweep, mop and spray buff all hard flooring. Ensure a consistent finish around edges and base. • Wash and disinfect all waste receptacles. Monthly: • Dust all high reach areas including, but not limited to, tops of doors, frames, pictures, lamps, light fixtures, window blinds, air diffusers and return grills, ventilating louvers. • Machine clean and polish all flooring. All flooring shall be maintained, at the minimum, as a mid gloss finish at all times. Quarterly: • Clean all wall panels 72” and higher.
Main Lobby. 1. Sweep lobby floor, clean spills and stains. Damp mop floor as necessary. 2. Spot clean all entrance glass, directory glass, check glass doors for fingerprints and smudges twice a day. Dust windowsills and metal ledges as necessary. 3. Remove or place runners as necessary. Vacuum lobby mats as required. 4. Clean ashtrays twice a day.
Main Lobby. The work referenced above is referred to herein as the "Base Building Work". Subtenant acknowledges that it has inspected the Premises and the Base Building Work, is familiar with the condition thereof, and subject to latent defects and the terms of this Work Letter, accepts the Base Building Work, the Premises, and any existing equipment and improvements located in the Premises absolutely "AS IS," and agrees that, except as otherwise specifically set forth in this Work Letter, Sublandlord shall not be required to perform any work, install (or remove) any improvements or equipment, or render any services to make the Building or the Premises ready for Subtenant's occupancy. Subtenant acknowledges that some portions of the Premises may have been previously occupied by other tenants and may contain fixtures and improvements, which may be used or removed at Subtenant's option and at Subtenant's sole cost, subject to the terms of the Sublease.
Main Lobby. 1.12.1.1 Area of about 100 square meters. 1.12.1.2 Porcelain granite flooring at a basic price of 35 dollars per square meter. 1.12.1.3 Wall covering to the acoustic ceiling of porcelain granite at a basic price of 35 dollars per square meter. 1.12.1.4 Ceilings from a combination of mineral ceiling and sunken (lowered) plaster per Architect’s design. Basic price for ceiling panels – 30 dollars per square meter. 1.12.1.5 Lighting at the level of LUX 800 with blending of light fixtures at high level per Architect’s choice including option for concealed lighting. 1.12.1.6 Broad, monitored, entrance door which meets escape and fire safety demands. Door design based on “Securit” requirements with all the required accessories. 1.12.1.7 Designed Information desk incorporating all the various control systems for the building, (entry control, CCTV systems, air-conditioning control, search and apprehension systems, building monitoring system). The work includes the desk and required infrastructure.
Main Lobby. Sweep and damp mop granite (b) Clean and polish all metal surfaces (c) Empty and clean all ashtrays (d) Clean and empty all trash receptacles (e) Clean glass doors and surround areas to remove streaks and fingerprints (f) Clean all granite walls as needed (g) Clean directory boards and glass (h) Clean all wall bases (i) Clean and polish telephone alcoves and restroom doors WORK TO BE PERFORMED MONTHLY ----------------------------
Main Lobby. NONE POLYMER PROCESSING