Main Metering System and Check Metering System Requirements Clause Samples

Main Metering System and Check Metering System Requirements. 1.1 The Main Metering System and Check Metering System shall consist of a single set of three current transformers and potential transformers feeding both a primary and a backup three phase four wire metering instrument. 1.2 The Main Metering System and the Check Metering System shall be designed such that the overall error of the installation, (including instrument transformers, wiring, and metering instruments) shall be no less or greater than two tenth of a percent (±0.2% for power flows through the metering installation. 1.3 The Main Metering System and Check Metering System shall be selected to have rated error no less or greater than two tenth of a percentage (±0.2%) over the equivalent load range.

Related to Main Metering System and Check Metering System Requirements

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.

  • System Requirements Apple Software is supported only on Apple-branded hardware that meets specified system requirements as indicated by Apple.

  • System Logging The system must maintain an automated audit trail which can 20 identify the user or system process which initiates a request for PHI COUNTY discloses to 21 CONTRACTOR or CONTRACTOR creates, receives, maintains, or transmits on behalf of COUNTY, 22 or which alters such PHI. The audit trail must be date and time stamped, must log both successful and 23 failed accesses, must be read only, and must be restricted to authorized users. If such PHI is stored in a 24 database, database logging functionality must be enabled. Audit trail data must be archived for at least 3 25 years after occurrence.

  • System Upgrades The Connecting Transmission Owner shall procure, construct, install, and own the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement. To the extent that design work is necessary in addition to that already accomplished in the Class Year Interconnection Facilities Study for the Interconnection Customer, the Connecting Transmission Owner shall perform or cause to be performed such work. If all the Parties agree, the Interconnection Customer may construct System Upgrade Facilities and System Deliverability Upgrades. 5.2.1 As described in Section 32.3.5.3 of the SGIP in Attachment Z of the ISO OATT, the responsibility of the Interconnection Customer for the cost of the System Upgrade Facilities and System Deliverability Upgrades described in Attachment 6 of this Agreement shall be determined in accordance with Attachment S of the ISO OATT, as required by Section 32.3.5.3.2

  • Software Requirements 7 Developer shall prepare the Project Schedule using Oracle’s Primavera P6.