Main Steam Flow Capacity Test. As part of Unit 6 Performance Testing, a *** will be performed to assure that Unit 6 can achieve this steam flow operating condition on a continuous basis. Although not specifically addressed in ASME PTC 46, the Main Steam Flow Capacity will be verified using the ASME PTC 46 governed Unit 6 Performance Test instrumentation and calibration methods, except where approved by the Owner. • The test duration will be an 8 hour continuous run. • Fuel and sorbent corrections will not be applied unless outside the range of the Agreement specified design range for these materials. • Condenser exhaust pressure will be controlled as close as possible to ***. by operation of the cooling tower fans. Corrections will be made to adjust results to ***. • Equipment will not exceed EPC Agreement (Exhibit A) or Manufacturer ratings. • Spare/redundant equipment shall not be operated, these include, but are not limited to: • Spare hotwell and condensate booster pumps • Spare pulverizer, unless allowed by Steam Generator guarantee • Spare closed cooling water pump and heat exchanger • Spare limestone ball mill • Spare gypsum dewatering train Contractor shall report test results for the *** and the corresponding net electrical output (which is not guaranteed for this test). Net electrical output shall be corrected to Base Performance Conditions for power factor, and wet bulb.
Appears in 2 contracts
Sources: Engineering, Procurement and Construction Agreement (Duke Energy CORP), Engineering, Procurement and Construction Agreement (Duke Energy Carolinas, LLC)