Maintenance and Operating Break Periods Sample Clauses

Maintenance and Operating Break Periods. Maintenance and Operating Employees may take a break period of fifteen (15) minutes in the first half of their regular shift and a break period of fifteen (15) minutes in the second half of their regular shift, provided the regular shift is eight (8) hours or more. Break periods are not to interfere with work of an emergency nature and it is understood that Employees are “on call” during such periods.

Related to Maintenance and Operating Break Periods

  • Maintenance and Operation Member-Generator agrees to maintain their system and facilities in accordance with applicable manufacturer's recommended maintenance schedule and standard prudent engineering practices. Member-Generator covenants and agrees to operate their system, facilities and equipment so as to minimize the likelihood for a malfunction or other disturbance, damaging or otherwise affecting or impairing Cooperative’s electrical system. Member-Generator shall comply with all applicable laws, regulations, zoning, building codes, safety rules and other environmental regulations or restrictions applicable to the design, installation, operation and maintenance of the Member-Generator's System.

  • INTERIM MAINTENANCE PERIOD During the interim maintenance period between obtaining of the completion certificate of such Project and formation and operationalization of the Association the Promoter shall through itself or through a facility management company to run, operate, manage and maintain the Common Areas. The Promoter shall endeavour that the committee responsible for the maintenance and operation of the Common Areas will be required to provide manpower for maintaining the Common Areas, wherever required, and to collect maintenance charges and also guest charges and the user charges for the utilities being provided on “pay by use” basis, if any. The maintenance and management of Common Areas by the committee will primarily include but not limited to maintenance of water works, common electrical installations, DG Sets, landscaping, driveways, parking areas, lobbies, lifts and staircases, AMC’s etc. It will also include safety and security of the Project such as fire detection and protection and management of general security control of the Project. The Rules/ Bye Laws to regulate the use and maintenance of the Common Areas shall during the interim maintenance period shall be framed by the Promoter with such restrictions as may be necessary for proper maintenance and all the Allottees are bound to follow the same. After the Common Areas of the Project are handed over to the Association, the Association may adopt the Rules and the Bye laws framed by the Promoter, with or without amendments, as may be deemed necessary by the Association.

  • Application and Operation 5 PART 2 - DISPUTE RESOLUTION AND CONSULTATION 12

  • Operating and Maintenance Costs The Participating Generator shall be responsible for all its costs incurred in connection with operating and maintaining the Generating Units identified in Schedule 1 for the purpose of meeting its obligations under this Agreement.

  • Repair and Maintenance 8.1 LANDLORD’S REPAIR AND MAINTENANCE. Landlord at its cost shall maintain the following: a. The structural parts of the building and other improvements, that are part of the leased premises which structural parts include the foundations, bearing and exterior walls, subflooring and roof. b. The unexposed electrical, plumbing and sewage systems, including, without limitation, those portions of the systems lying outside the premises. c. The Landlord shall have all snow and ice removed from the sidewalks leading to the premises as soon as practicable, and see that snow from the parking area is properly and reasonably removed and that all refuse and garbage is removed from the collection area. d. The Landlord shall maintain the common areas, parking areas, hallways and stairs and restrooms, in a safe, clean and orderly condition. 8.2 T’ENANT’S REPAIRS AND MAINTENANCE. Tenant at its cost shall perform the following: a. Any construction, modification and/or improvements made to the leased premise will be at the expense of the Tenant (unless otherwise agreed), and will require the approval of the Landlord. Any improvements or modifications performed by, or on behalf of, the Tenant will, at the option of the Landlord, remain as part of the Keuka Business Park at the conclusion of the lease term. b. Except as provided in paragraph 8.1 above, Tenant at its cost shall maintain the leased premises, including all janitorial care of the office and restroom facilities associated with this space, and at the expiration of the term of this Lease Agreement, or prior termination, Tenant shall surrender the leased premises to Landlord in the same condition as received, normal wear and tear, damage from the elements, fire or other casualty, damage Landlord is required to repair hereunder, or damage from the negligence or willful misconduct of Landlord, its agents or employees, excepted. c. Tenant also agrees to maintain outdoor areas affected by the operations of the business in an orderly fashion, including, but not limited to, stacking and disposal of pallets, trash and recycling areas, employee litter and damage to the facilities.