Major Revisions. Making major revisions in drawings, specifications or other documents when such revisions are: 3.3.1.1 inconsistent with written approvals or instructions previously given by the Owner; 3.3.1.2 requested by the Owner in writing because the bids received exceed the owner's estimate of Construction Cost, except where such excess is due to changes initiated by the Architect/Engineer in scope, capacities of basic systems, or the kinds and quality of materials, finishes or equipment; 3.3.1.3 required by the enactment of new codes, laws or regulations subsequent to the preparation of such documents; or 3.3.1.4 due to changes required as a result of the Owner's failure to render decisions within a time period reasonably specified by the Architect/Engineer.
Appears in 1 contract
Sources: Architect and Engineering Agreement
Major Revisions. Making major revisions in drawings, specifications or other documents when such revisions are:
3.3.1.1 inconsistent with written approvals or instructions previously given by the Owner;
3.3.1.2 requested by the Owner in writing because the bids received exceed the owner's Owner’s estimate of Construction Cost, except where such excess is due to changes initiated by the Architect/Engineer in scope, capacities of basic systems, or the kinds and quality of materials, finishes or equipment;
3.3.1.3 required by the enactment of new codes, laws or regulations subsequent to the preparation of such documents; or
3.3.1.4 due to changes required as a result of the Owner's failure to render decisions within a time period reasonably specified by the Architect/Engineer.
Appears in 1 contract
Sources: Architect/Engineer Agreement