Making good. No structural member shall be chased or cut without the written permission of the Engineer-In-Charge. Any tiles or finished surfaces or floors damaged by the contractor while doing his work shall be made good with new tiles or other furnishing material. No payment shall be admissible for such repairs. The Engineer-In-Charge may at his discretion get the damaged work repaired by other agencies and debit the cost of such repair to the contractor. All materials used in the works shall conform to the specifications attached herewith and latest relevant I.S. Specifications. As far as possible materials bearing I.S. certification marks shall be used with the approval of the Engineer-In-Charge. Unless otherwise specified and expressly approved in writing by the Engineer-In-Charge, materials of makes and specifications mentioned in this document/BOQ shall be used. Samples of all materials shall be got approved before placing order and the approved samples shall be deposited with Construction Manager. If directed, materials shall be tested in an approved testing laboratory and the contractor shall produce the test certificate in original to the Construction Manager and the entire charges for original as well as repeated tests shall be borne by the Contractor. If required by the Construction Manager, the Contractor shall arrange to test portions of the work at his own cost in order to prove their soundness and efficiency. If after any such test the work or portions of work is found in the opinion of the Construction Manager, to be defective or unsound, the Contractor shall pull down and re-do the same at his own cost. Defective materials shall be removed from site. It shall be obligatory for the Contractor to furnish certificates if demanded by the Construction Manager from manufactures or materials suppliers, that the work has been carried out by using their material and installed/fixed as Per their recommendations Cement, required, for the plumbing work shall be supplied to the Contractor through the Civil Contractors. However, the contractor will have to make his own arrangement to lift the cement from the godown to the site. Cost of cement issued will be recovered from contractor. Cement shall be stored in weather proof shed with raised wooden plank flooring to prevent deterioration by dampness or intrusion by foreign matter. Sand: Sand shall be clean, shells, free from silt, clay, loam, shells, vegetable matter and be as approved by the Construction Manager. Coarse Aggregate: Shall be angular, tough, sharp and well graded stone metal, Basalt from approved source. Bricks: Bricks shall be local best quality obtainable and shall be as specified in relevant clauses of IS.
Appears in 1 contract
Sources: Construction Contract
Making good. No structural member All materials and workmanship in building up, making good, etc., are to match existing and where new materials abut existing, they are to be neatly jointed to same. 'Making good' existing work where disturbed or damaged shall mean the provision of the necessary new material to match existing and the necessary workmanship so that a complete restoration is achieved to the satisfaction of the Eskom Dx PM MOU Official. Making good' where abutting walls, etc., are removed, shall mean the provision of the necessary material and workmanship in filling the gaps to match surrounding finishes so that a complete and perfect surface, continuous with surrounding surfaces and matching of same, is obtained to the Eskom Dx PM MOU Official's satisfaction. Mode of Procedure Notwithstanding anything to the contrary contained herein the Eskom Dx PM MOU Official at all times reserves the right to direct the order in which the various parts of the Contract are to be executed. The Service Provider shall give priority to any individual section or portion of the Works that, in the opinion of the Eskom Dx PM MOU Official, requires to be expedited. Should it appear, in the Eskom Dx PM MOU Official's opinion, that work in any area is not being executed in accordance with the requirements of the Contract Programme, the Service Provider shall provide additional manpower and resources and shall work additional overtime and do everything else required to bring the work back to programme to the satisfaction of the Eskom Dx PM MOU Official and to the Contractor's cost Method Statement The Tenderer shall produce, when required to do so by the Eskom Dx PM MOU Official, a Method Statement outlining the methods of construction and labour and plant resources that he proposes to use in the execution of the Works. Any approval given or observation made by the Eskom Dx PM MOU Official shall not relieve the Contractor of his sole responsibility to adopt the methods of construction and to provide the labour and plant resources necessary for the due and proper timeous execution of the Works. Encroachment 1 During the course of the building operations, the Contractor shall be chased held entirely responsible for any encroachment onto any adjoining properties, buildings, etc., or cut without the written permission of the Engineer-In-Charge. Any tiles or finished surfaces or floors damaged by the contractor while doing his work shall be made good with new tiles or other furnishing material. No payment shall be admissible for such repairs. The Engineer-In-Charge may at his discretion get the damaged work repaired by other agencies servitudes and debit the cost of such repair to the contractor. All materials used in the works shall conform to the specifications attached herewith and latest relevant I.S. Specifications. As far any remedial measures as possible materials bearing I.S. certification marks shall be used with the approval of the Engineer-In-Charge. Unless otherwise specified and expressly approved in writing required by the Engineer-In-Charge, materials of makes and specifications mentioned in this document/BOQ shall be used. Samples of all materials shall be got approved before placing order and the approved samples shall be deposited with Construction Manager. If directed, materials shall be tested in an approved testing laboratory and the contractor shall produce the test certificate in original to the Construction Manager and the entire charges for original as well as repeated tests Eskom Dx PM MOU Official shall be borne by the Contractor. If required by the Construction Manager, the Contractor shall arrange to test portions of the work at his own cost in order to prove their soundness and efficiency. If after any such test the work or portions of work is found in the opinion of the Construction Manager, to be defective or unsound, the Contractor shall pull down and reItem 1 R -do the same at his own cost. Defective materials shall be removed from site. It shall be obligatory for the Contractor to furnish certificates if demanded by the Construction Manager from manufactures or materials suppliers, that the work has been carried out by using their material and installed/fixed as Per their recommendations Cement, required, for the plumbing work shall be supplied to the Contractor through the Civil Contractors. However, the contractor will have to make his own arrangement to lift the cement from the godown to the site. Cost of cement issued will be recovered from contractor. Cement shall be stored in weather proof shed with raised wooden plank flooring to prevent deterioration by dampness or intrusion by foreign matter. Sand: Sand shall be clean, shells, free from silt, clay, loam, shells, vegetable matter and be as approved by the Construction Manager. Coarse Aggregate: Shall be angular, tough, sharp and well graded stone metal, Basalt from approved source. Bricks: Bricks shall be local best quality obtainable and shall be as specified in relevant clauses of IS.
Appears in 1 contract
Sources: Nec3 Term Service Contract (Tsc3)