Material Delivery. The Contractor shall advise the Engineer at least 2 weeks prior to the delivery of any material from a commercial source. The Contractor shall provide the Engineer with one copy of all invoices (prices are not required) for materials delivered to the project with the following exceptions: asphalt concrete; dense graded aggregate, to include aggregate base, sub base, and select material; fine aggregate; open graded coarse aggregate; crusher run aggregate; and road stabilization aggregate. The printed weights of each load of these materials, shall accompany the delivery, and such information shall be made available to the Engineer or his designated representative at the Project.
Appears in 19 contracts
Material Delivery. The Contractor shall advise the Engineer at least 2 weeks prior to the delivery of any material from a commercial source. The Contractor shall provide the Engineer with one copy of all invoices (prices are not required) for materials delivered to the project with the following exceptions: asphalt concrete; dense graded aggregate, to include aggregate base, sub base, and select material; fine aggregate; open graded coarse aggregate; crusher run aggregate; and road stabilization aggregate. The printed weights of each load of these materials, shall accompany the delivery, and such information informati on shall be made available to the Engineer or his designated representative at the Project.
Appears in 2 contracts