Material Submittals. 2.12.1 All proposed materials to be used by the Design-Builder shall be submitted to the Owner for written approval.
Appears in 2 contracts
Sources: Design Build Contract, Design Build Contract
Material Submittals. 2.12.1 All proposed materials to be used by the Design-Builder shall be submitted to the Owner for written approval.
Appears in 2 contracts
Sources: Design Build Contract, Design Build Contract