Measurement and mixing Clause Samples

Measurement and mixing. All cement is to be measured by weight, the 50 kg bag of cement being used as aunit. Specification Concrete Work (2/F/10) F.29 Measurement and mixing (Cont‟d.) The amount of water shall be the minimum required to produce a dense cohesive concrete of adequate workability, to be determined by trial mixes. This amount shall be accurately gauged and adjusted from time to time to compensate for variations in moisture content of the aggregate by an approved method. All concrete shall be mixed in a batch type mechanical mixer of approved type having a drum rotating about a horizontal or inclined axis. The speed of the drum is to be not more than twenty and not less than fourteen revolutions per minute. Each mixer is to be fitted with a water measuring device capable of accurate measurement to five litres for one cubic meter mixers and prorata for smaller sizes and so arranged that the accuracy is not affected by variations in the pressure of the water supply line. The fine and coarse aggregate and the cement shall be mixed for at least four turns, after which the required amount of water shall be added gradually while the mixer is in motion and the concrete mixed for not less than one and a half minutes to uniform colour and consistency. The volume of concrete mixed in any one batch is not to exceed the rated capacity of the mixer. The whole of the mixed batch is to be removed before materials for a fresh batch enter the drum. Concrete as mixed in accordance with the foregoing shall not be modified by the addition of further water or in any other manner. On the cessation of work, including all stoppages exceeding twenty minutes, or any change of type of cement used in the mix, the mixer and all handling plant shall be washed out with clean water. At least one slump test shall be made each day concreting is in progress, under the supervision of the Engineer.
Measurement and mixing. In the case of loose materials such as sand, broken stone, mortar, etc. the proportions demanded by the specifications must be measured in properly constructed measuring boxes, or in such other manner as shall be instructed by the Superintending Engineer. Measurement is not to be done in ▇▇▇.▇▇ heaps when intimate mixtures such as mortar, concrete etc. are to be formed. The mixing must always be done on closely constructed platforms so that their will be no leakage of any of the materials through the floor of the platform and also so that no foreign materials can be incorporated during mixing. These platforms must be approved by the Superintending Engineer. The cost of such measuring boxes and platforms and all the work referred to here in shall be borne by the contractor.

Related to Measurement and mixing

  • Measurement and Billing 5.6.1 For billing purposes, each Party shall pass Calling Party Number (“CPN”) information on each call carried over the Traffic Exchange Trunks at such time as the originating switch is equipped for SS7 and from all switches no later than December 31, 1998. At such time as either Party has the ability, as the Party receiving the traffic, to use such CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, such receiving Party shall bill the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, or Interstate Exchange Access rates applicable to each minute of Traffic for which CPN is passed, as provided in Exhibit A and applicable Tariffs. 5.6.2 If, under the circumstances set forth in subsection 5.6.1, the originating Party does not pass CPN on up to ten percent (10%) of calls, the receiving Party shall bill the originating Party the Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, for which CPN is passed. For the remaining up to ten percent (10%) of calls without CPN information, the receiving Party shall bill the originating Party for such traffic as Local Traffic termination rates, Intrastate Exchange Access rates, Intrastate/Interstate Transit Traffic rates, or Interstate Exchange Access rates applicable to each minute of traffic, as provided in Exhibit A and applicable Tariffs, in direct proportion to the minutes of use of calls passed with CPN information. 5.6.3 If the originating Party does not pass CPN on more than ten percent (10%) of calls, or if the receiving Party lacks the ability to use CPN information to classify on an automated basis traffic delivered by the other Party as either Local Traffic or Toll Traffic, and the originating Party chooses to combine Local and Toll Traffic on the same trunk group, it will supply an auditable Percent Local Use (“PLU”) report quarterly, based on the previous three months’ traffic, and applicable to the following three months. If the originating Party also chooses to combine Interstate and Intrastate Toll Traffic on the same trunk group, it will supply an auditable Percent Interstate Use (“PIU”) report quarterly, based on the previous three months’ terminating traffic, and applicable to the following three months. In lieu of the foregoing PLU and/or PIU reports, the Parties may agree to provide and accept reasonable surrogate measures for an agreed-upon interim period. 5.6.4 Measurement of billing minutes for purposes of determining terminating compensation shall be in conversation seconds.

  • Measurement Should the State terminate this contract as herein provided, no fees other than fees due and payable at the time of termination shall thereafter be paid to the Engineer. In determining the value of the work performed by the Engineer prior to termination, the State shall be the sole judge. Compensation for work at termination will be based on a percentage of the work completed at that time. Should the State terminate this contract under paragraph (4) or (5) above, the Engineer shall not incur costs during the thirty-day notice period in excess of the amount incurred during the preceding thirty days.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Temperature Measurement Temperature will be measured by the nearest automatic Melbourne Bureau of Meteorology Monitoring Station for example (but not limited to): Melbourne, Moorabbin, Dunns Hill, Melbourne Airport, Frankston, and Point ▇▇▇▇▇▇. At the commencement of each project, the onsite management and employee representatives shall agree which is to be the applicable automatic weather monitoring station.

  • MEASUREMENT AND VERIFICATION The goal of this task is to report the benefits resulting from this project by performing M&V of GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per subtask 1.9 (if using outside vendor) • Coordinate demonstration site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurements (and calculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8, FPIP Calculator Tool of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for each project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation that will be used. o A description of the key input parameters and output metrics that will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months (or shorter period as approved in writing by the CAM) of post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: