Measurement and Payment for Gabions Clause Samples

Measurement and Payment for Gabions. (a) Chain Link Fencing, Weld mesh etc.: The unit of measurement for chain link fencing weld mesh etc for the manufacture of gabions will be per square metre, calculated from the area required to construct the boxes as shown on the drawings or directed by the Engineer without allowing for waste. The rate shall include for supplying, transporting to any point on the site, cutting, waste, bending, welding or binding, placing in position and binding, and all labour, tools plant, supervision, overheads and profit.

Related to Measurement and Payment for Gabions

  • Measurement and Payment Temporary traffic control work, including, but not limited to installation and removal of portable signs, cones, drums, skinny drums, flaggers, AFAD’s, changeable message boards, truck mounted attenuators, flashing arrow boards, and pilot vehicles will be paid at the contract lump sum price for

  • Fees and Payment for Purchased Services 5.1. User Fees. You shall pay all fees specified in all Order Forms hereunder. Except as otherwise specified herein or in an Order Form, (i) fees are quoted and payable in United States dollars (ii) fees are based on services purchased and not actual usage, (iii) payment obligations are non-cancelable and fees paid are non-refundable, and (iv) the number of User subscriptions purchased cannot be decreased during the relevant subscription term stated on the Order Form. User subscription fees are based on monthly periods that begin on the subscription start date and each monthly anniversary thereof; therefore, fees for User subscriptions added in the middle of a monthly period will be charged for that full monthly period and the monthly periods remaining in the subscription term.

  • Calculation and Payment Interest on LIBOR Loans and all other Obligations and the amount of any fees set forth in Subsection 1.4 shall be calculated on the basis of a three hundred sixty (360) day year for the actual number of days elapsed. Interest on the Base Rate Loans shall be calculated on the basis of a three hundred sixty-five or -six (365-6) day year for the actual number of days elapsed. The date of funding or conversion to a Base Rate Loan and the first day of an Interest Period with respect to a LIBOR Loan shall be included in the calculation of interest. The date of payment of any Loan and the last day of an Interest Period with respect to a LIBOR Loan shall be excluded from the calculation of interest; provided, if a Loan is repaid on the same day that it is made, one (1) day’s interest shall be charged. Interest accruing on the Base Rate Loan is payable in arrears on each of the following dates or events: (i) the last day of each calendar quarter; (ii) the prepayment of such Loan (or portion thereof); and (iii) the applicable Maturity Date or the Revolving Loan Expiration Date, as the case may be, whether by acceleration or otherwise. Interest accruing on each LIBOR Loan is payable in arrears on each of the following dates or events: (i) the last day of each applicable Interest Period; (ii) if the Interest Period is longer than three (3) months, on each three-month anniversary of the commencement date of such Interest Period; (iii) the prepayment of such Loan (or portion thereof); and (iv) the applicable Maturity Date or the Revolving Loan Expiration Date, as the case may be, whether by acceleration or otherwise.

  • Contract Amount and Payment for Services The total amount of this Contract will not exceed $1,099,187.00. This includes System Agency’s share of $915,989.00 and Grantee’s required match amount of $183,198.00. All expenditures under this Contract will be in accordance with Attachment B, Budget.

  • Services and Payment Consultant agrees to undertake and complete the Services (as defined in Exhibit A) in accordance with and on the schedule specified in Exhibit A. As the only consideration due Consultant regarding the subject matter of this Agreement, Company will pay Consultant in accordance with Exhibit A.