MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-charge by any subsequent certificate or by the final certificate. 8.8. The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. A Standard Flow chart for payment is as below: Not the part of Bid Document

Appears in 4 contracts

Sources: Service Level Agreement / Conditions of Contract, Service Level Agreement / Conditions of Contract, Service Level Agreement / Conditions of Contract

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with “CODE FOR UNIFORM SYSTEM OF MAINTENANCE, CONTROL, VERTFICATION OF COALSTOCK AND MEASUREMENT, VERIFICATION OF OVER BURDEN REMOVAL IN ALLMINES OF COAL INDIA LIMITED” and the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-In- Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-charge by any subsequent certificate or by the final certificate. 8.8. The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. A Standard Flow chart for payment is as below: Not the part of Bid Document

Appears in 4 contracts

Sources: Service Level Agreement, Service Level Agreement, Service Level Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-charge by any subsequent certificate or by the final certificate. 8.8. The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. A Standard Flow chart for payment is as below: Not the part of Bid DocumentDeleted.

Appears in 3 contracts

Sources: Service Level Agreement, Service Level Agreement, Service Level Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. 8.1 All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. 8.2 Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. 8.3 Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. 8.4 In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. 8.5 Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. 8.6 Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. 8.7 Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-Engineer- in-charge by any subsequent certificate or by the final certificate. 8.8. 8.8 The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. 8.9 Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. A Standard Flow chart for payment is as below: Not the part of Bid Document8.10 Deleted.

Appears in 2 contracts

Sources: Service Level Agreement, Service Level Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. 8.1 All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. 8.2 Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. 8.3 Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. 8.4 In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. 8.5 Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. 8.6 Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. 8.7 Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-in- charge by any subsequent certificate or by the final certificate. 8.8. 8.8 The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. 8.9 Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. 8.10 A Standard Flow chart for payment is as below. Joint measurement 1. Interim monthly/fortnightly 03-05 days Unit / Mine Survey Level-1: Not If activity not by EIC or his measurement shall department of completed within authorised be done by concerned TL: Area GM representative Unit/Mine project in Level-2: If and by the part Surveyor along coordination activity not contractor or with representative with HOD of Bid Documentcompleted within his authorised of Contractor as per concerned 10 days of TL: representative the rules of the department of D(T), duly recorded company and duly respective area / Subsidiary/CIL in MB/Log recorded in Subsidiary HQ

Appears in 1 contract

Sources: Service Level Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-In- Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-charge by any subsequent certificate or by the final certificate. 8.8. The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. A Standard Flow chart for payment is as below: below [Not the to be part of Bid Document]. Description Activities Timelines Responsibility Escalation Matrix

Appears in 1 contract

Sources: Joint Venture/Consortium Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. 8.1 All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. 8.2 Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. 8.3 Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. 8.4 In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. 8.5 Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. 8.6 Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. 8.7 Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-charge by any subsequent certificate or by the final certificate. 8.8. 8.8 The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. 8.9 Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. 8.10 A Standard Flow chart for payment is as below: below [Not the to be part of Bid Document].

Appears in 1 contract

Sources: Service Level Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. For the purpose of this tender/work, the word ‘measurement’ shall mean provisions under the scope of work being made available 24X7 without stoppage or breakdown and the same being reflected in hours available in the autogenerated availability report. 8.1. 8.1 All items of work carried out by the Contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. 8.2 Measurements shall be taken jointly by the Engineer-In-Charge or his authorized representative and by the Contractor or his authorized representative. 8.3. 8.3 Before taking measurements of any work, the Engineer-In-Charge or the person deputed by him for the purpose shall intimate the Contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. 8.4 In the event of failure on the part of Contractor to attend or to send his authorized representative to attend the measurement assessment of availability after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-Engineer- In-Charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-In-Charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose8.5 Deleted. 8.6. Payment on account shall be made on the Engineer-In-Charge of work certifying the sum to which the Contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit and such other amounts as may be deductible or recoverable in terms of the contract8.6 Deleted. 8.7. Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-charge by any subsequent certificate or by the final certificate8.7 Deleted. 8.8. 8.8 The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. 8.9 Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authority. 8.10. A Standard Flow chart for payment is as below: Not the part of Bid Document8.10 Deleted. 8.11 Deleted.

Appears in 1 contract

Sources: Service Level Agreement

MEASUREMENT AND PAYMENT. Except where any general or detailed description of the work in quantities provides otherwise, measurements of work done shall be taken in accordance with “CODE FOR UNIFORM SYSTEM OF MAINTENANCE, CONTROL, VERIFICATION OF COAL STOCK AND MEASUREMENT, VERIFICATION OF OVER BURDEN REMOVAL IN ALL MINES OF COAL INDIA LIMITED’ 2020” and the relevant standard method of measurement as applicable to the schedule of quantities/schedule of work /specification to the contract. In the case of items not covered by any of the aforesaid contract documents, measurement shall be taken in accordance with the relevant standard method of measurement issued by the Indian Standard Institution. 8.1. 8.1 All items of work carried out by the Contractor contractor in accordance with the provisions of the contract having a financial value shall be entered in the Measurement Book/Log Book, etc. as prescribed by the Company company so that a complete record is obtained of all work performed under the contract and the value of the work carried out can be ascertained and determined therefrom. 8.2. 8.2 Measurements shall be taken jointly by the Engineer-Inin-Charge charge or his authorized representative and by the Contractor contractor or his authorized representative. 8.3. 8.3 Before taking measurements of any work, the Engineer-Inin-Charge charge or the person deputed by him for the purpose shall intimate the Contractor contractor to attend or to send his representative to attend the measurement. Every measurement thus taken shall be signed and dated by both the parties on the site on completion of the measurement. If the Contractor contractor objects to any of the measurements, a note to that effect shall be made in the Measurement Book /Log Book and signed and dated by both the parties. 8.4. 8.4 In the event of failure on the part of Contractor contractor to attend or to send his authorized representative to attend the measurement after receiving the intimation, or to countersign or to record objection within a week from the date of the measurement, the measurement taken by the Engineer-Inin-Charge charge or by his authorized representative shall be taken to be the correct measurement of the work done. 8.5. 8.5 Payment on Account - The Contractor shall submit interim bill/bills for the work carried out/materials provided in accordance with the contract. The Engineer-Inin-Charge charge shall then arrange for verification of the bill/bills with reference to the measurements taken or to be taken or any other records relevant for the purpose. 8.6. 8.6 Payment on account shall be made on the Engineer-Inin-Charge of work charge certifying the sum to which the Contractor contractor is considered entitled by way of interim payment for the work executed as covered by the bill/bills after deducting the amount already paid, the Security Deposit security deposit and such other amounts as may be deductible or recoverable in terms of the contract. 8.7. 8.7 Deleted. 8.8 Deleted 8.9 Any certificate given by the Engineer-in-charge for the purpose of payment of interim bill/bills shall not of itself be conclusive evidence that any work/materials to which it relates is/are in accordance with the contract and may be modified or corrected by the Engineer-in-in- charge by any subsequent certificate or by the final certificate. 8.8. 8.10 The Company reserves the right to recover/enforce recovery of any overpayments detected after payment as a result of post-payment audit or technical examination or by any other means, notwithstanding the fact that the amount of disputed claims, if any, of the Contractor exceeds the amount of such overpayment and irrespective of the facts whether such disputed claims of the Contractor are the subject matter of arbitration or not. The amount of such overpayments may be recovered from the subsequent bills under the contract, failing that from Contractor's claim under any other contract with the Company or from the Contractor's Security Deposit or the Contractor shall pay the amount of overpayment on demand. 8.9. 8.11 Amount payable/ repayable for any subsequent change in the Goods and Services Tax (GST) will be made to/ from the Contractors after departmental verification of such changes of tax law issued by statutory authorityStatutory Authority. 8.10. 8.12 A Standard Flow chart for payment is as below. Description Activities Timelines Responsibility Escalation Matrix Joint measurement by EIC or his authorized representative and by the 1. Interim monthly/ fortnightly measurement shall be done by Unit/Mine Surveyor along with representative of Contractor as per the 03-05 days Unit/Mine Survey department of concerned project in Coordination with HOD of Level-1: Not the part of Bid DocumentIf activity not completed within TL.Area GM

Appears in 1 contract

Sources: Service Level Agreement (Sla)