MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)
Appears in 1 contract
Sources: Division Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from the FPIP Calculator Tool (Attachment 8 of the grant solicitation) of from the equipment/process/system(s)/subsystem(s), or sub-system(s) that are to be upgraded and/or replaced and/or upgraded, replaced, or modified. o Ensure installation of sub-metering equipment and data loggers for pre/pre and post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include include, but not be limited to:
to descriptions of: o A description of the The monitoring equipment and instrumentation which that will be used. o A description of the The key input parameters and output metrics which that will be measured. o A description of the The M&V protocol and analysis methods to be employed. o A description of the The independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) calculations based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) calculations of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include include, but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to measure and report the benefits energy use and performance resulting from this project by performing measurement the operation of installed equipment, including reduction in natural gas utilization, increased efficiency, and verification (M&V) of greenhouse gas (GHG) and energy consumption reductionair emission benefits. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop an M&V protocol for pre-installation and post-installation measurement (and calculation): o Electric, calculation of electricity and natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysisusage. • Prepare and provide submit a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. ; o A description of the key input parameters and output metrics which will be measured. ; o A description of the M&V protocol and analysis methods to be employed. ; and o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as if approved in writing by the CAM) of pre-pre- installation measurements (and calculations) calculations based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as if approved in writing by the CAM) of post-post- installation measurements based on the M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and whytheir causes; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes the M&V protocol, pre and post install post-installation measurements (and calculations), analysis, and results of electricity and natural gas use and other work performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan discussion of whether the project goals and objectives were met (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and finalSection II.C).
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post pre- and post-data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reductionproject. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculation): calculations following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. ; and o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Measurement and Verification Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. ; o A description of the key input parameters and output metrics which will be measured. ; o A description of the M&V protocol and analysis methods to be employed. ; and o A description of the independent, third-party M&V measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) , based on the M&V protocol for pre-installation. install • Prepare and provide a Pre-Installation M&V Measurement and Verification Findings Report for the demonstration site that which includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions. • Prepare and provide a Post-Installation M&V Measurement and Verification Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG greenhouse gas emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final).
Appears in 1 contract
Sources: Commission Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHGgreenhouse gas) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description Description of the monitoring equipment and instrumentation which will be used. o A description Description of the key input parameters and output metrics which will be measured. o A description Description of the M&V protocol and analysis methods to be employed. o A description Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative Narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary Summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG greenhouse gas emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG greenhouse gas reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and greenhouse gas emission reductions identified in section II.C were met. • Prepare CPR Report #3 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #3
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project by performing demonstration site or use third party vendor for measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description Description of the monitoring equipment and instrumentation which will be used. o A description Description of the key input parameters and output metrics which will be measured. o A description Description of the M&V protocol and analysis methods to be employed. o A description Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • M&V Plan (draft and final) Prepare a CPR Report #2 in accordance with subtask 1.3. • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)Participate in a CPR Meeting #2.
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reductionproject. • Enter into agreement with M&V Measurement and Verification (M&V) subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculation): calculations) following Section II.B.2 of the grant solicitation manual 3: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. ; and o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Measurement and Verification Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. ; o A description of the key input parameters and output metrics which will be measured. ; o A description of the M&V protocol and analysis methods to be employed. ; and o A description of the independent, third-party M&V measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-installationinstall. • Prepare and provide a Pre-Installation M&V Measurement and Verification Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitationsolicitation manual) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • modified. ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-post- installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include include, but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final).
Appears in 1 contract
Sources: Commission Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG emission and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculation): calculations) for each phase: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site each phase to include but not be limited to:
o A description of the monitoring equipment and instrumentation which will be used. : o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform For each phase, perform three months (or shorter period as approved in writing by the CAM) of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes for each phase, M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop For each phase, develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site each phase that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG emission reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II. C were met. • M&V Plan (draft Prepare Critical Project Report #2 and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)participate in a CPR meeting in accordance with subtask 1.3.
Appears in 1 contract
Sources: Agreement Fpi 19 021
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) M&V of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor). • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified modified. • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre pre- and post post-install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) Report (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor factors from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor factors from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft o Discuss whether the energy and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)GHG emission reductions identified in section
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three Gather and validate 3 months (or shorter period as approved in writing by the CAM) of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-post- installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Discuss whether the energy, water, and greenhouse gas emission savings goals identified in Section II. C. were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: New Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement agreements with M&V subcontractor subcontractors per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor subcontractors at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-installation measurements (and calculations) based on the M&V protocol for pre-installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Prepare a Critical Project Review Report #2 and participate in CPR meeting in accordance with subtask 1.3. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project by performing demonstration site or use third party vendor for measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites. • Develop M&V protocol for pre-installation measurement (and calculation): calculations) following Section II.B.2 of the grant solicitation manual2: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Measurement and Verification Plan for the project demonstration site sites to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-installation. install • Prepare and provide a Pre-Installation M&V Measurement and Verification Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for postPost-installation Installation measurements (and or calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions. • Prepare and provide a Post-Installation M&V Measurement and Verification Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG greenhouse gas emissions that directly result from this project. • 2GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018 ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇.▇▇.▇▇▇/contracts/GFO-18-903/ o Provide all key assumptions used to estimate and determine energy and GHG greenhouse gas reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations, and benefits to disadvantaged communities. • M&V Measurement and Verification Plan (draft and final) • Pre-Installation M&V Measurement and Verification Findings Report (draft and final) • Post-Installation M&V Measurement and Verification Findings Report(s) (draft and final)
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor factors from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre pre- and post post-install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations, and quantification of the benefits of the microgrid if a power outage occurred during the agreement term. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #3 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #3
Appears in 1 contract
Sources: New Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) project. Project team will use a third-party vendor for M&V of greenhouse gas (GHG) GHG and energy consumption reductionreductions. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. Project team may use in- house expertise of the project by performing demonstration site or use third party vendor for measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site site(s) • Develop M&V protocol for pre-installation measurement (and calculation): calculations) following Section II.B.2 of the grant solicitation manual3: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. ; and o Ensure If necessary, ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. ; o A description of the key input parameters and output metrics which will be measured. ; o A description of the M&V protocol and analysis methods to be employed. ; and o A description of the independent, third-party M&V measurement and verification services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG greenhouse gas emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • modified. ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. 3 GFO-18-903, Food Production Investment Program, California Energy Commission, November 2018. ▇▇▇▇▇://▇▇▇.▇▇▇▇▇▇.▇▇.▇▇▇/contracts/GFO-18-903/000_FPIP_Solicitation_Manual.docx • Prepare and provide a Post-Installation installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final).
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor) • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) M&V of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site(s). • Develop M&V protocol for pre-installation measurement measurements (and calculation): calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o • Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include include, but not be limited to:
: o A description of the monitoring equipment and instrumentation which that will be used. o A description of the key input parameters and output metrics which that will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide Provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified modified. • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include include, but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 (if using outside vendor). • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre pre-and post post-install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: New Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reductionproduction and consumption. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. used o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Prepare a CPR Report #3 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #3
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II.C were met. • Prepare CPR Report #2 in accordance with subtask 1.3 (CPR Meetings). • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: New Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reductionreductions. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install installation measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install installation measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all , which shall include but not be limited to: o All key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all o All key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discussion of whether the energy production and GHG emission reductions identified in Section II.C were met. • Prepare a CPR Report #3 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #3
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description Description of the monitoring equipment and instrumentation which will be used. o A description Description of the key input parameters and output metrics which will be measured. o A description Description of the M&V protocol and analysis methods to be employed. o A description Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for as a seasonal facilitiesfacility, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project. The project by performing measurement and verification (M&V) team will use a third-party vendor for M&V of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified modified. • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all , and include the following: o All key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all o All key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG reduction goals in section II.C were met. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Division Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
o A description of the monitoring equipment and instrumentation which will be used. : o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) emission and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) Reports (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • project and include the following: o Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • o Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. o Discuss whether the energy and GHG emission reductions identified in section II. C were met. • M&V Plan (draft Prepare a CPR Report #2 and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)participate in a CPR Meeting in accordance with subtask 1.3.
Appears in 1 contract
Sources: Agreement Fpi 19 033
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) and energy consumption reductionbefore and after project installation to verify GHG emission reductions. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site • Develop M&V protocol for pre-installation measurement (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the FPIP grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description Description of the monitoring equipment and instrumentation which will be used. o A description Description of the key input parameters and output metrics which will be measured. o A description Description of the M&V protocol and analysis methods to be employed. o A description Description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG emission and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site sites • Develop M&V protocol for pre-installation measurement measurements (and calculation): calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o ⚫ Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the each demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • modified. ⚫ Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-post- installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) fossil fuel consumption and energy consumption associated GHG reduction. • Enter into agreement with M&V subcontractor per Task 1.9 • Coordinate site visits with the M&V subcontractor at the demonstration site site(s) • Develop M&V protocol for pre-installation measurement measurements (and calculationcalculations): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the each project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final):
Appears in 1 contract
Sources: Grant Agreement
MEASUREMENT AND VERIFICATION. The goal of this task is to report the benefits resulting from this project by performing measurement and verification (M&V) of greenhouse gas (GHG) GHG and energy consumption reduction. • Enter into agreement with M&V subcontractor per Task 1.9 1.9. • Coordinate site visits with the M&V subcontractor at the demonstration site site. • Develop M&V protocol for pre-installation measurement (and calculation): o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that are to be upgraded and/or replaced and/or modified. o Ensure installation of sub-metering equipment and data loggers for pre/post data analysis. • Prepare and provide a detailed M&V Plan for the project demonstration site to include but not be limited to:
: o A description of the monitoring equipment and instrumentation which will be used. o A description of the key input parameters and output metrics which will be measured. o A description of the M&V protocol and analysis methods to be employed. o A description of the independent, third-party M&V services to be employed, if applicable. • Perform three months (or shorter period as approved in writing by the CAM) of pre-pre- installation measurements (and calculations) based on the M&V protocol for pre-pre- installation. • Prepare and provide a Pre-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre-install measurements (and calculations), analysis, and results performed in this task. • Develop M&V protocol for post-installation measurements (and calculations) of: o Electric, natural gas and/or other fossil fuel consumption and GHG emissions (use appropriate emissions factor from Attachment 8 of the grant solicitation) of the equipment/process/system(s)/sub-system(s) that will be upgraded and/or replaced and/or modified • Perform 12 months or two seasons, for seasonal facilities, (or shorter period as approved in writing by the CAM) of post-installation measurements based on M&V protocol for post-installation. • Provide a summary of post-installation M&V progress in Progress Report(s) (see subtask 1.5) which shall include but not be limited to: o A narrative on operational highlights from the reporting period, including any stoppages in operation and why; and o A summary of M&V findings from the reporting period. • Analyze post-installation electrical, natural gas and/or other fossil fuel consumption and GHG emissions. • Prepare and provide a Post-Installation M&V Findings Report for the demonstration site that includes M&V protocol, pre and post install measurements (and calculations), analysis, and results performed in this task. Results should at a minimum report on the reduction of electricity, natural gas and/or other fossil fuel usage and reductions of GHG emissions that directly result from this project. • Provide all key assumptions used to estimate and determine energy and GHG reductions (and additions, if applicable). • Provide all key assumptions used to estimate projected benefits, including targeted market sector (e.g., population and geographic location), projected market penetration, baseline and projected energy use and cost, operating conditions, and emission reduction calculations. • Prepare a CPR Report #2 in accordance with subtask 1.3. • Participate in a CPR Meeting. • M&V Plan (draft and final) • Pre-Installation M&V Findings Report (draft and final) • Post-Installation M&V Findings Report(s) (draft and final)) • CPR Report #2
Appears in 1 contract
Sources: Grant Agreement