MEASURING EQUIPMENT 1. Seller will maintain and operate, at its own, expense and at the point of delivery of gas hereunder, a meter or meters and other necessary equipment by which the volume of gas delivered hereunder shall be measured. Such meters and equipment shall remain the property of the Seller. 2. ▇▇▇▇▇ agrees to furnish to Seller for operating Seller's meters, at not cost to Seller. 3. ▇▇▇▇▇ agrees to change the charts on meters at no cost to Seller and forward same to Seller. 4. Buyer hereby grants to Seller suitable rights-of-way and easements necessary or incidental for the installation, maintenance, operation and removal of pipeline and other facilities together with rights of ingress thereto and egress there from at all times and hereby agrees to deliver to Seller, for the sum of one dollar ($1 .00), an appropriate instrument or grant defining such rights and easements located on Buyer's plant site. 5. Buyer may install, maintain and operate such check measuring equipment, including a recording gravitometer and calorimeter as it shall desire, provided that such equipment shall be so installed so as not to interfere with the operation of Seller's measuring equipment at or near the point of deliver. However, all ▇▇▇▇▇▇▇▇ to the Buyer shall be based on the metering of the Seller, subject only to the provisions of Paragraph 8 of this Article. 6. Each party shall have the right to be present at the time of any installing, reading, cleaning, changing, repairing, inspecting, testing, calibrating, or adjusting done in connection with the other's measuring equipment used in measuring deliveries hereunder and each party shall advise the other of any intended major maintenance operation sufficiently in advance in order that the other party may conveniently have its representative present. 7. All installation of measuring equipment, applying to or effecting deliveries hereunder, shall be made in such manner as to permit an accurate determination of the quantity of gas delivered and ready verification of the accuracy of measurement. Orifice meter installations, if used, shall conform to the recommendation for design and installation contained in the Gas Measurement Committee Report No. 3 to the American Gas Association published April, 1955, and any modifications and amendments thereof and shall include the use of flange connections. 8. Measurement on meter or meters shall be conclusive of both parties except where the meter is defective or fails to register, or if found in error, in either of which case Seller shall (a) By using the registration of any check meter if installed and accurately registering, or, in the absence of (a): (b) By correcting the error if the percentage of error by calibration, test or mathematical calculation, or, in the absence of both (a) and (b) then: (c) By estimating the quantity of delivery from deliveries during periods under similar conditions when the meter was registering accurately; and an appropriate billing adjustment shall be made in accordance wtth the current Rules and Regulations governing gas systems issued by the Commission. 9. Seller will maintain its meters in good order and to this end will make periodic tests of its meters pursuant to the current Rules and Regulations governing gas systems issued by the Commission, or at such shorter intervals as seem to Seller desirable. If ▇▇▇▇▇ is dissatisfied with the accuracy at any time, it may call upon Seller to have the meter tested ·in accordance with all regulations relating to such tests and results of such tests as found in the current Rules and Regulations governing gas systems issued by the Commission. 10. Each party shall preserve all records for a period of at least two (2) years.
Measuring DNS parameters Every minute, every DNS probe will make an UDP or TCP “DNS test” to each of the public-‐DNS registered “IP addresses” of the name servers of the domain name being monitored. If a “DNS test” result is undefined/unanswered, the tested IP will be considered unavailable from that probe until it is time to make a new test.
Measuring EPP parameters Every 5 minutes, EPP probes will select one “IP address” of the EPP servers of the TLD being monitored and make an “EPP test”; every time they should alternate between the 3 different types of commands and between the commands inside each category. If an “EPP test” result is undefined/unanswered, the EPP service will be considered as unavailable from that probe until it is time to make a new test.
Outputs Analogue and digital outputs of protected content are allowed if they meet the requirements in this section and if they are not forbidden elsewhere in this Agreement..
Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the ▇▇▇▇▇ Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/▇▇▇▇▇▇▇ KXM-550, GE Grid Solutions KOTEF ▇▇▇.▇▇, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556