Common use of Mechanical Clause in Contracts

Mechanical. 4.3.1. Heating and cooling load calculations as required and major duct or pipe runs sized to interface with structural. 4.3.2. Major mechanical equipment should be scheduled indicating size and capacity. 4.3.3. Ductwork and piping should be substantially located and sized. 4.3.4. Devices in ceiling should be located. 4.3.5. Legend showing all symbols used on drawings. 4.3.6. More developed Outline Specifications indicating quality level and manufacture. 4.3.7. Control Systems to be identified. 4.3.8. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.

Appears in 11 contracts

Sources: Architectural Services Agreement, Architectural Services Agreement, Architectural Services Agreement

Mechanical. 4.3.1. Heating and cooling load calculations as required and major duct or pipe runs sized to interface with structural. 4.3.2. Major mechanical equipment should be scheduled indicating size and capacity. 4.3.3. Ductwork and piping should be substantially located and sized. 4.3.4. Devices in ceiling should must be located. 4.3.5. Legend showing all symbols used on drawings. 4.3.6. More developed Outline Specifications outline specifications indicating quality level and manufacture. 4.3.7. Control Systems to systems must be identified. 4.3.8. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.

Appears in 3 contracts

Sources: Architectural Services Agreement, Architectural Services Agreement, Architectural Services Agreement

Mechanical. 4.3.13.3.1. Heating and cooling load calculations as required and major duct or pipe runs sized to interface with structural. 4.3.23.3.2. Major mechanical equipment should be scheduled indicating size and capacity. 4.3.33.3.3. Ductwork and piping should be substantially located and sized. 4.3.43.3.4. Devices in ceiling should must be located. 4.3.53.3.5. Legend showing all symbols used on drawings. 4.3.63.3.6. More developed Outline Specifications outline specifications indicating quality level and manufacture. 4.3.73.3.7. Control Systems to systems must be identified. 4.3.83.3.8. Further evaluation and confirmation of the load requirements of all equipment and systems, the impact of those on existing facilities, and the requirements to increase these loads to accommodate the increase.

Appears in 1 contract

Sources: Architectural Services Agreement