Meetings With District Operations Sample Clauses

Meetings With District Operations. Meetings with District Operations to discuss Operations and Maintenance (O&M). Attendance by Consultant PM and up to two (2) other members at four (4) meetings for four (4) hours each.

Related to Meetings With District Operations

  • Safe Operations Notwithstanding any other provision of this Agreement, an NTO may take, or cause to be taken, such action with respect to the operation of its facilities as it deems necessary to maintain Safe Operations. To ensure Safe Operations, the local operating rules of the ITO(s) shall govern the connection and disconnection of generation with NTO transmission facilities. Safe Operations include the application and enforcement of rules, procedures and protocols that are intended to ensure the safety of personnel operating or performing work or tests on transmission facilities.

  • RELATIONSHIP WITH DIRECTORS Directors, officers and employees of the Advisor or an Affiliate of the Advisor or any corporate parents of an Affiliate, or directors, officers or stockholders of any director, officer or corporate parent of an Affiliate may serve as a Director and as officers of the Company, except that no director, officer or employee of the Advisor or its Affiliates who also is a Director or officer of the Company shall receive any compensation from the Company for serving as a Director or officer other than reasonable reimbursement for travel and related expenses incurred in attending meetings of the Directors.

  • Joint Funded Project with the Ohio Department of Transportation In the event that the Recipient does not have contracting authority over project engineering, construction, or right-of-way, the Recipient and the OPWC hereby assign certain responsibilities to the Ohio Department of Transportation, an authorized representative of the State of Ohio. Notwithstanding Sections 4, 6(a), 6(b), 6(c), and 7 of the Project Agreement, Recipient hereby acknowledges that upon notification by the Ohio Department of Transportation, all payments for eligible project costs will be disbursed by the Grantor directly to the Ohio Department of Transportation. A Memorandum of Funds issued by the Ohio Department of Transportation shall be used to certify the estimated project costs. Upon receipt of a Memorandum of Funds from the Ohio Department of Transportation, the OPWC shall transfer funds directly to the Ohio Department of Transportation via an Intra- State Transfer Voucher. The amount or amounts transferred shall be determined by applying the Participation Percentages defined in Appendix D to those eligible project costs within the Memorandum of Funds. In the event that the Project Scope is for right-of-way only, notwithstanding Appendix D, the OPWC shall pay for 100% of the right-of-way costs not to exceed the total financial assistance provided in Appendix C.

  • Americans with Disabilities Act Compliance a. When the Project scope includes work on sidewalks, curb ramps, or pedestrian- activated signals or triggers an obligation to address curb ramps or pedestrian signals, the Parties shall: i. Utilize ODOT standards to assess and ensure Project compliance with Section 504 of the Rehabilitation Act of 1973 and the Americans with Disabilities Act of 1990 as amended by the ADA Amendments Act of 2008 (together, “ADA”), including ensuring that all sidewalks, curb ramps, and pedestrian-activated signals meet current ODOT Highway Design Manual standards; ii. Follow ODOT’s processes for design, modification, upgrade, or construction of sidewalks, curb ramps, and pedestrian-activated signals, including using the ODOT Highway Design Manual, ODOT Design Exception process, ODOT Standard Drawings, ODOT Construction Specifications, providing a temporary pedestrian accessible route plan and current ODOT Curb Ramp Inspection form; iii. At Project completion, send a completed ODOT Curb Ramp Inspection Form 734- 5020 to the address on the form as well as to State’s Project Manager for each curb ramp constructed, modified, upgraded, or improved as part of the Project. The completed form is the documentation required to show that each curb ramp meets ODOT standards and is ADA compliant. ▇▇▇▇’s fillable Curb Ramp Inspection Form and instructions are available at the following address: b. State shall ensure that temporary pedestrian routes are provided through or around any Project work zone. Any such temporary pedestrian route shall include directional and informational signs, comply with ODOT standards, and include accessibility features equal to or better than the features present in the existing pedestrian facility. State shall also ensure that advance notice of any temporary pedestrian route is provided in acessible format to the public, people with disabilities, and disability organizations at least 10 days prior to the start of construction. c. Agency shall ensure that any portions of the Project under Agency’s maintenance jurisdiction are maintained in compliance with the ADA throughout the useful life of the Project. This includes, but is not limited to, Agency ensuring that: i. Pedestrian access is maintained as required by the ADA, ii. Any complaints received by Agency identifying sidewalk, curb ramp, or pedestrian- activated signal safety or access issues are promptly evaluated and addressed, iii. Any repairs or removal of obstructions needed to maintain Project features in compliance with the ADA requirements that were in effect at the time of Project construction are completed by Agency or abutting property owner pursuant to applicable local code provisions, iv. Any future alteration work on Project or Project features during the useful life of the Project complies with the ADA requirements in effect at the time the future alteration work is performed, and v. Applicable permitting and regulatory actions are consistent with ADA requirements. d. Maintenance obligations in this section shall survive termination of this Agreement.

  • COMPLIANCE WITH OCCUPATIONAL SAFETY AND HEALTH By submission of a bid in response to this solicitation, the Bidder certifies that all material, equipment, etc., contained in their bid meets all OSHA requirements. Bidder further certifies that if they are the awarded Contractor, and the material, equipment, etc., delivered is subsequently found to be deficient in any OSHA requirements in effect on date of delivery, all costs necessary to bring the material, equipment, etc., into compliance with the aforementioned requirements shall be borne by the Contractor.