Common use of Meteorological Data Reporting Requirement Clause in Contracts

Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: [SPECIFY AGREED UPON METEOROLOGICAL AND FORCED OUTAGE DATA REQUIREMENTS] [OR] [NOT APPLICABLE FOR THIS INTERIM ISA]

Appears in 1 contract

Sources: Interconnection Service Agreement

Meteorological Data Reporting Requirement. (Applicable to wind generation facilities only) The wind generation facility shall, at a minimum, be required to provide the Transmission Provider with site-specific meteorological data including: • Temperature (degrees Fahrenheit) • Wind speed (meters/second) • Wind direction (degrees from True North) • Atmosphere Atmospheric pressure (hectopascals) • Forced outage data (wind turbine and MW unavailability) The Transmission Provider and Interconnection Customer may mutually agree to any additional meteorological data that are required for the development and deployment of a power production forecast. All requirements for meteorological and forced outage data must be commensurate with the power production forecasting employed by the Transmission Provider. Such additional mutually agreed upon requirements for meteorological and forced outage data are set forth below: [SPECIFY SPECIFICY AGREED UPON METEOROLOGICAL AND FORCED OUTAGE DATA REQUIREMENTS] [OR] OR [NOT APPLICALBE APPLICABLE FOR THIS INTERIM ISACSA]

Appears in 1 contract

Sources: Interconnection Construction Service Agreement