Meter Malfunction Clause Samples

Meter Malfunction. In the event the Billing Meter fails to register accurately within the allowable accuracy limits as set forth above, then for purposes of preparing (or adjusting) any affected invoice Buyer shall adjust the amount of measured Energy for the period of time the Billing Meter was shown to be in error. If the time the Billing Meter became inaccurate can be determined, then the adjustment to the amount of measured Energy shall be made for the entire time from the time that the Billing Meter became inaccurate until the recalibration of the Billing Meter. If the time the Billing Meter became inaccurate cannot be determined, then the Billing Meter shall be deemed to have failed to register accurately for fifty percent (50%) of the time since the date of the last calibration of the Billing Meter.
Meter Malfunction. In the event either Party's meters or related equipment serving Old Dominion malfunctions, such Party shall make reasonable estimates of energy used but not registered on the meter. Such estimates shall be used by PJM and the Parties for purposes of administering the PJM Agreements.

Related to Meter Malfunction

  • Electrical Provide drawings for the following systems: .1 Lighting including circuiting and luminaire identification and switching. Also provide illuminance computer printout for all indoor typical indoor spaces and parking lots. .2 Convenience outlets and circuiting, special outlets and circuiting, television outlets, and power systems and equipment. Provide riser diagrams for all electrical systems including master clock, intercom, fire alarm, ITV, computer networking/telephone. Also, provide for emergency and normal power distribution. Provide luminaire schedule. .3 Panel schedule may be in preliminary form but circuitry must be included. .4 Applicable installation details. .5 General legend and list of abbreviations. .6 Voltage drop computation for all main feeders. .7 Short circuit analysis .8 Provide 1/2" scale floor plan and wall elevations for all electrical rooms.

  • Utilities The Landlord shall provide the following utilities and services to the Tenant: _

  • Electrical Items All electrical items purchased under this Grant Agreement/Contract or used in the performance of approved and eligible grant-funded activities must meet all applicable Occupational Safety and Health Administration (OSHA) standards and regulations, and bear the appropriate listing from Underwriters Laboratory (UL), Factory Mutual Resource Corporation (FMRC), or National Electrical Manufacturers Association (NEMA).

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Equipment Failures In the event of equipment failures beyond the Administrator's control, the Administrator shall take reasonable and prompt steps to minimize service interruptions but shall have no liability with respect thereto. The Administrator shall develop and maintain a plan for recovery from equipment failures which may include contractual arrangements with appropriate parties making reasonable provision for emergency use of electronic data processing equipment to the extent appropriate equipment is available.