Meter Retesting Clause Samples

The Meter Retesting clause establishes the procedures and conditions under which a utility meter may be retested to verify its accuracy. Typically, this clause outlines who can request a retest, the process for conducting the retest, and how costs are allocated depending on whether the meter is found to be faulty or accurate. For example, if a customer suspects a meter is over-recording usage, they may request a retest, and if the meter is indeed inaccurate, the utility may bear the cost and adjust the billing. The core function of this clause is to ensure fairness and accuracy in utility billing by providing a clear mechanism for resolving disputes over meter readings.
Meter Retesting. Either Party may from time to time request a retest of the meters and/or submeters if it reasonably believes that one or more of them are not accurate within the tolerance limits established by the Transmission Provider [or the interconnecting Gas pipeline], as applicable. The requesting Party shall pay for any such retest and shall provide the other Party with not less than 14 days prior Notice of such retest. Such other Party will have the right to have a representative present during such retest. [For facilities other than Gas-fired facilities, omit the bracketed language].
Meter Retesting. Either Party may from time to time request a retest of the meters and/or submeters if it reasonably believes that one or more of them are not accurate within the tolerance limits established by the Transmission Provider, as applicable. The requesting Party shall pay for any such retest and shall provide the other Party with not less than fourteen (14) days prior Notice of such retest. The other Party will have the right to have a representative present during such retest.

Related to Meter Retesting

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the ▇▇▇▇▇ Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/▇▇▇▇▇▇▇ KXM-550, GE Grid Solutions KOTEF ▇▇▇.▇▇, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • STATEWIDE ACHIEVEMENT TESTING When CONTRACTOR is a NPS, per implementation of Senate Bill 484, CONTRACTOR shall administer all Statewide assessments within the California Assessment of Student Performance and Progress (“CAASPP”), Desired Results Developmental Profile (“DRDP”), California Alternative Assessment (“CAA”), achievement and abilities tests (using LEA-authorized assessment instruments), the Fitness Gram, , the English Language Proficiency Assessments for California (“ELPAC”), and as appropriate to the student, and mandated by LEA pursuant to LEA and state and federal guidelines. CONTRACTOR is subject to the alternative accountability system developed pursuant to Education Code section 52052, in the same manner as public schools. Each LEA student placed with CONTRACTOR by the LEA shall be tested by qualified staff of CONTRACTOR in accordance with that accountability program. ▇▇▇ shall provide test administration training to CONTRACTOR’S qualified staff. CONTRACTOR shall attend LEA test training and comply with completion of all coding requirements as required by ▇▇▇.

  • Baseline For purposes of measuring a reduction in net tax revenue, the interim final rule measures actual changes in tax revenue relative to a revenue baseline (baseline). The baseline will be calculated as fiscal year 2019 (FY 2019) tax revenue indexed for inflation in each year of the covered period, with inflation calculated using the Bureau of Economic Analysis’s Implicit Price Deflator.163 FY 2019 was chosen as the starting year for the baseline because it is the last full fiscal year prior to the COVID– 162 See, e.g., Tax Policy Center, How do state earned income tax credits work?, https:// ▇▇▇.▇▇▇▇▇▇▇▇▇▇▇▇▇▇▇.▇▇▇/▇▇▇▇▇▇▇▇-▇▇▇▇/▇▇▇-▇▇- state-earned-income-tax-credits-work/ (last visited May 9, 2021).

  • Annual Performance Evaluation On either a fiscal year or calendar year basis, (consistently applied from year to year), the Bank shall conduct an annual evaluation of Executive’s performance. The annual performance evaluation proceedings shall be included in the minutes of the Board meeting that next follows such annual performance review.