Metering Location Clause Samples

Metering Location. Metering of capacity and energy purchased from the QF will normally be accomplished at the point of delivery. If point-of-delivery metering is not practical, metering may be established at other locations. Exact location will be determined on a site-specific basis. All metering will be compensated to the point of delivery.
Metering Location. The locations of the Metering Installations are defined in item [7] (“Transmission Network Connection”) of Schedule 1 of the Works Coordination Agreement.
Metering Location. (Check one) Seller elects metering location pursuant to Section 8 as follows: ___Edison's side of the Interconnection Facilities X Seller's side, of the Interconnection Facilities. Loss compensation factor --- is equal to (to be determined), pursuant to Section 8.3. General Terms & Conditions
Metering Location. Seller elects metering location pursuant to Section 8 as follows: Seller's side of the Interconnection Facilities. Loss compensation factor is equal to .5%, pursuant to Section 8.3.
Metering Location. The measurement point for all Performance Tests, unless stated otherwise below, shall be the Facility meter located on the 34.5kV bus in the project substation (the “Facility Meter”), adjusted to account for losses between this meter and the POI, as described in Exhibit B-1.
Metering Location. (Check one) Seller elects metering location pursuant to Section 8 as follows: _____ Edison's side of the Interconnection Facilities X Seller's side, of the Interconnection Facilities. Loss compensation ------ factor is equal to (to be determined), pursuant to Section 8.3. July 8, 1987 ▇▇▇▇▇ ▇▇▇▇▇▇ indicated no transformer to be used, project to be directly connected to 115 kV system, therefore no transformer losses associated with this project. --▇▇▇▇ ▇▇▇▇▇▇▇▇▇▇ General Terms & Conditions
Metering Location. The locations of the Metering Installations are defined in Diagram 1 (“Transmission Network Connection”) of Schedule 1 (“Powerlink Assets”).
Metering Location. The two parties agree with each other on the metering locations of metering systems as follows: - Main metering location: …. - Backup metering location 1: …. - Backup metering location 2: …. - Output separation and metering location (if any): …

Related to Metering Location

  • Closing Location The Closing shall be held at the location designated by the Corporation or, if no such designation is made, at the office of Seller's Attorney.

  • Data Location 1.1. The CONTRACTOR shall not store or transfer non-public COUNTY data outside of the United States. This includes backup data and Disaster Recovery locations. The CONTRACTOR will permit its personnel and contractors to access COUNTY data remotely only as required to provide technical support. (Remote access to data from outside the continental United States is prohibited unless approved in advance and in writing by the County.) 1.2. The CONTRACTOR must notify the COUNTY in advance and in writing of any location changes to CONTRACTOR’s data center(s) that will process or store County data.

  • Work Location While employed by the Company hereunder, the Executive shall perform his duties (when not traveling or engaged elsewhere in the performance of his duties) at the offices of the Company in Bermuda. The Executive shall travel to such places on the business of the Company in such manner and on such occasions as the Company may from time to time reasonably require.

  • Project Location [Insert the location of the Project, if applicable]

  • Testing of Metering Equipment Connecting Transmission Owner shall inspect and test all of its Metering Equipment upon installation and at least once every two (2) years thereafter. If requested to do so by NYISO or Developer, Connecting Transmission Owner shall, at Developer’s expense, inspect or test Metering Equipment more frequently than every two (2) years. Connecting Transmission Owner shall give reasonable notice of the time when any inspection or test shall take place, and Developer and NYISO may have representatives present at the test or inspection. If at any time Metering Equipment is found to be inaccurate or defective, it shall be adjusted, repaired or replaced at Developer’s expense, in order to provide accurate metering, unless the inaccuracy or defect is due to Connecting Transmission Owner’s failure to maintain, then Connecting Transmission Owner shall pay. If Metering Equipment fails to register, or if the measurement made by Metering Equipment during a test varies by more than two percent from the measurement made by the standard meter used in the test, Connecting Transmission Owner shall adjust the measurements by correcting all measurements for the period during which Metering Equipment was in error by using Developer’s check meters, if installed. If no such check meters are installed or if the period cannot be reasonably ascertained, the adjustment shall be for the period immediately preceding the test of the Metering Equipment equal to one-half the time from the date of the last previous test of the Metering Equipment. The NYISO shall reserve the right to review all associated metering equipment installation on the Developer’s or Connecting Transmission Owner’s property at any time.