Metering Readings Sample Clauses

The Metering Readings clause establishes the procedures and responsibilities for recording and reporting measurements from utility meters, such as electricity, water, or gas. Typically, it outlines how and when readings should be taken, who is authorized to perform the readings, and the method for communicating the results to relevant parties. This clause ensures accurate billing and accountability by providing a clear process for verifying consumption, thereby minimizing disputes over usage and charges.
Metering Readings. The Parties shall require that integrated meter readings are provided at least once each hour for Interconnection Facilities accounting purposes and meter registers are read at least monthly, as close as practical to the last hour of the month. An appropriate adjustment shall be made to register readings not taken on the last hour of the month.
Metering Readings. The Parties shall ensure that integrated meter readings are provided at least once each hour for Interconnection Facilities accounting purposes and meter registers are read at least monthly, as close as practicable to the last hour of the month. An appropriate adjustment shall be made to register readings not taken on the last hour of the month. Issued by: ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇, President Effective: November 15, 2008 Issued on: November 13, 2008 New York Independent System Operator, Inc. Rate Schedule No. 1 Original Sheet No. 21

Related to Metering Readings

  • Metering The Interconnection Customer shall be responsible for the Connecting Transmission Owner’s reasonable and necessary cost for the purchase, installation, operation, maintenance, testing, repair, and replacement of metering and data acquisition equipment specified in Attachments 2 and 3 of this Agreement. The Interconnection Customer’s metering (and data acquisition, as required) equipment shall conform to applicable industry rules and Operating Requirements.

  • Delivery Point The delivery point is the point of delivery of the Power Product to the CAISO Controlled Grid (the “Delivery Point”). Seller shall provide and convey to Buyer the Power Product from the Generating Facility at the Delivery Point. Title to and risk of loss related to the Power Product transfer from Seller to Buyer at the Delivery Point.

  • Delivery Points ‌ Project water made available to the Agency pursuant to Article 6 shall be delivered to the Agency by the State at the delivery structures established in accordance with Article 10.

  • Meters (a) You must allow safe and unhindered access to your premises for the purposes of reading and maintaining the meters (where relevant). (b) We will use our best endeavours to ensure that a meter reading is carried out as frequently as is needed to prepare your bills, consistently with the metering rules and in any event at least once every 12 months.

  • Calibration The comparison of a measurement system or device of unverified accuracy with a measurement system of known and greater accuracy to detect deviation of the unverified measurement system from required performance specifications (of the unverified measurement system or device) and to quantify all measured values to applicable units of the international system of units.