Common use of Method A Clause in Contracts

Method A. Construction slash shall be scattered outside the clearing limits without damaging trees outside the clearing area. Logs shall be placed away from trees, positioned so that they will not roll, not placed on top of one another or left leaning on other trees. Scattered stumps shall be placed in an upright position. (2) Method B. Stumps, roots, rocks, topsoil and other grubbing debris shall be concentrated in ▇▇▇▇▇ dump areas. ▇▇▇▇▇ dump areas shall be located by the Engineer, be a maximum of 300 feet apart along the road centerline, and generally be located in natural depressions or tucked away behind denser vegetation or ground rises. ▇▇▇▇▇ dumps will vary in size depending on each site, but shall not be closer than 10 feet outside of the clearing limits. ▇▇▇▇▇ dump material shall be matted down as much as possible and shall not obstruct natural drainages.

Appears in 2 contracts

Sources: Timber Sale Contract, Timber Sale Contract