Common use of Method of Construction Clause in Contracts

Method of Construction. At first the conductor is removed from bundle/drum straighten without knots, bends, etc. Stringing of conductor shall be done with draw vice. Conductor shall not be twisted while stringing. Shackle insulators shall be used if the line deviates by 30 degrees or more, at terminal pole and at junction/ cut pole. Parallel double groove clamp having two nut bolts designated to carry full line current shall be used for making Jumper wire connections. On straight line the conductor shall be bounded on top groove of insulator and at angular position binding shall be done in side groove. Binding wire of 12 SWG shallbe of the same metal as that of conductor.

Appears in 1 contract

Sources: Construction Contract

Method of Construction. At first the conductor is removed from bundle/drum straighten without knots, bends, etc. Stringing of conductor shall be done with draw drawing vice. Conductor shall not be twisted while stringing. Shackle Disc insulators shall be used if the line deviates by 30 degrees or more, terminal pole and tri-pole or four pole structure at terminal pole and at junction/ cut pole. Parallel double groove clamp having two nut bolts designated to carry full line current shall be used for making Jumper wire connections. Universal parallel double groove clamp having two nut bolts shall be used for Tap Off point. On straight line the conductor shall be bounded on top groove of insulator and at angular position binding shall be done in side groove. Binding wire of 12 SWG shallbe shall be of the same metal as that of conductor.

Appears in 1 contract

Sources: Construction Contract