Performance Assessment 6.1 The Performance Plan (Annexure A) to this Agreement sets out key performance indicators and competencies that needs to be evaluated in terms of – 6.1.1 The standards and procedures for evaluating the Employee’s performance; and 6.1.2 During the intervals for the evaluation of the Employee’s performance. 6.2 Despite the establishment of agreed intervals for evaluation, the Employer may in addition review the Employee’s performance at any stage while the contract of employment remains in force; 6.3 Personal growth and development needs identified during any performance review discussion must be documented in a Personal Development Plan as well as the actions agreed to and implementation must take place within set time frames; 6.4 The Employee’s performance will also be measured in terms of contributions to the goals and strategies set out in the Employer’s Integrated Development Plan (IDP) as described in 6.6 – 6.13 below; 6.5 The Employee will submit quarterly performance reports (SDBIP) and a comprehensive annual performance report at least one week prior to the performance assessment meetings to the Evaluation Panel Chairperson for distribution to the panel members for preparation purposes; 6.6 Assessment of the achievement of results as outlined in the performance plan: 6.6.1 Each KPI or group of KPIs shall be assessed according to the extent to which the specified standards or performance targets have been met (qualitative and quantitative) and with due regard to ad-hoc tasks that had to be performed under the KPI; 6.6.2 A rating on the five-point scale described in 6.9 below shall be provided for each KPI or group of KPIs which will then be multiplied by the weighting to calculate the final score; 6.6.3 The Employee will submit his self-evaluation to the Employer prior to the formal assessment; 6.6.4 In the instance where the employee could not perform due to reasons outside the control of the employer and employee, the KPI will not be considered during the evaluation. The employee should provide sufficient evidence in such instances; and 6.6.5 An overall score will be calculated based on the total of the individual scores calculated above.
Diagnostic Assessment 6.3.1 Boards shall provide a list of pre-approved assessment tools consistent with their Board improvement plan for student achievement and which is compliant with Ministry of Education PPM (PPM 155: Diagnostic Assessment in Support of Student Learning, date of issue January 7, 2013). 6.3.2 Teachers shall use their professional judgment to determine which assessment and/or evaluation tool(s) from the Board list of preapproved assessment tools is applicable, for which student(s), as well as the frequency and timing of the tool. In order to inform their instruction, teachers must utilize diagnostic assessment during the school year.
Phase II A small portion of the work for the Phase II modifications to the Plattsburgh Substation will be performed by Transmission Owner, and the remainder will be performed by Clinton and ▇▇▇▇▇▇▇▇▇. A detailed definition of the specific scope for Transmission Owner and Clinton and ▇▇▇▇▇▇▇▇▇ including interface points shall be defined during the design phase and, as such documents become available, copies will be delivered to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The full scope includes the installation of wave traps, CCVT’s and modifications and/or additions to relaying on the MWP-1 and MWP- 2 lines. These lines will be reconfigured at the completion of Phase II to connect to ▇▇▇▇▇ and ▇▇▇▇▇▇▇ Substations on MWP-1 and the ▇▇▇▇ Substation on MWP-2. Clinton and ▇▇▇▇▇▇▇▇▇ will design the upgrades and purchase the materials based on the outline specification that was prepared and issued by Transmission Owner. The work to be performed by Clinton and ▇▇▇▇▇▇▇▇▇ will include both the materials for the exterior and interior installations and items for Transmission Owner installation inside the control building in existing relay panels and communication racks. In addition, Clinton and ▇▇▇▇▇▇▇▇▇ will be responsible for the exterior and interior construction work and will provide construction management services in coordination with Transmission Owner. The civil design for the foundations and the electrical design for the cable runs to the control room will be designed by, as approved by Transmission Owner, and installed under the supervision and control of Clinton and ▇▇▇▇▇▇▇▇▇. The equipment will be selected and procured in accordance with the specifications developed during the detailed engineering phase, copies of which shall be furnished to the NYISO, Transmission Owner, Noble Altona Windpark, LLC and Marble River, LLC. The construction of the foundations, structures, wave traps, CCTV and cable runs into the control building to the termination cabinets will be completed by Clinton and ▇▇▇▇▇▇▇▇▇. The work at the Plattsburgh Substation will be installed under Transmission Owner’s CPP-1. Transmission Owner will provide Protection and Controls Engineering, install and terminate wiring from the termination cabinets to the control panels and relays, install relays and equipment in the existing panels, and will commission such work inside the 230kV control building. Transmission Owner will develop the communications protocols and data flow over the circuits.
Phase I In Phase I, the project will be connected as a tap to the Transmission Owner’s 230kV transmission line MWP-2 via one 230kV circuit breaker in series with one of two ring bus breakers for stuck breaker protection (one in each direction) and a tie-line breaker, as shown on the one-line diagram labeled CL-E-IA-01 attached to this Appendix A as Figure 1. The changes to the existing MWP-2 line protection for this arrangement are described in Phase I System Upgrades in Section II of this Appendix A.
Screening and Assessment Grantee shall: 1. Comply with all applicable rules in the TAC for SUD programs as stated in the SUD UM Guidelines Information, Rules, and Regulations regarding Screening and Assessment. 2. When documenting a CMBHS Substance Use Disorder screening, Grantee shall conduct the screening in a confidential, face-to-face interview unless there is documented justification for an interview by phone. 3. Document Financial Eligibility in CMBHS as required in the SUD UM Guidelines. 4. Conduct and document a CMBHS SUD Initial Assessment with the client to determine the appropriate levels of care for SUD treatment. The CMBHS assessment will identify the impact of substances on the physical, mental health, and other identified issues including Tuberculosis, Hepatitis C, sexually transmitted infection (STI), and Human Immunodeficiency Virus (HIV). i. If client indicates risk for these communicable diseases, Grantee shall refer the client to the appropriate community resources for further testing and counseling. ii. If the client is at risk for HIV, Grantee shall refer the client to pre and post- test counseling on HIV. 5. Grantee will also consider referring to the TRA Statewide HIV Intensive Residential Treatment facility to concurrently address medical needs and SUD. 6. If a client is living with HIV, Grantee will refer the client to the appropriate community resources to complete the necessary referrals and health related paperwork. 7. The assessment shall be signed by a Qualified Credential Counselor (QCC) and filed in the client record within three (3) service days of admission or a program may accept an evaluation from an outside entity if it meets the criteria for admission and was completed during the thirty (30) business days preceding admission.