Mix Design Acceptance. The Engineer will accept or reject the shotcrete mix design based on the results of the preconstruction field trials, testing and materials used. Before approving any changes to a previously accepted mix design, the Engineer may require additional preconstruction testing at no additional cost to the agency.
Appears in 2 contracts
Sources: Contract for Shotcrete Application, Contract Agreement