Mobilization and Demobilization. This item shall include the initial mobilization of the drill rig at the project site and the final demobilization after all borings are complete. The Contractor is required to furnish the drill rig and tools, in good condition and all other equipment necessary to carry on and complete the work properly. The Contractor may be required to mobilize and dismantle his equipment at existing highway structures, highway embankments, highway rights of way, off the traveled way, wooded areas and other difficult sites. The Contractor shall have the necessary equipment and personnel to assemble his drilling equipment at the desired locations. The backfilling and casing, work hours, permits or any other requirements made by the Department, Town, or other public transportation authority shall be complied with by the Contractor and any costs shall be considered as part on the unit price of Mobilization and Demobilization and no additional compensation will be allowed. No additional compensation will be made to the Contractor for preparing the application for and acquiring the entry permit and its associated fee. This item shall also include full compensation for all Traffic Control Equipment (such as; traffic control devices, cones, signs, etc.) required for the project. All material or equipment furnished under this item shall remain the property of the Contractor and shall be maintained and disposed of by him. This item shall carry all charges incident to such plant setup and removal, in order that the charges need not be distributed among the more variable items of the contract.
Appears in 2 contracts
Sources: Contract Agreement for Subsurface Explorations, Contract Agreement for Subsurface Explorations