Modelling requirements Sample Clauses

Modelling requirements. Facility Owner shall provide CEB with a detailed model complete with dynamic model of the Facility in DIgSILENT Powerfactory format suitable for electrical studies and calculations. Details of the software version shall be provided by CEB. CEB may request that the models be updated, during the Operation Period of this Agreement, to be compatible with changes in the CEB’s computing environment. Upon such request, Facility Owner shall update and submit such models to CEB without undue delay and shall submit the updated models to CEB.
Modelling requirements. Seller shall provide CEB with a detailed model complete with dynamic model of the Facility in DIgSILENT Powerfactory format suitable for electrical studies and calculations. Details of the software version shall be provided by CEB. CEB may request that the models be updated, during the Operation Period of this Agreement, to be compatible with changes in the CEB‟s computing environment. Upon such request, Seller shall update and submit such models to CEB without undue delay and shall submit the updated models to CEB.

Related to Modelling requirements

  • Staffing Requirements Licensee will be in full compliance with the main studio staff requirements as specified by the FCC.

  • Testing Requirements 12.1. Workplaces - 12.2. On workplaces where the value of the Commonwealth’s contribution to the project that includes the building work is at least $5,000,000, and represents at least 50% of the total construction project value or the Commonwealth’s contribution to the project that includes the building work is at least $10,000,000 (irrespective of its proportion of the total construction project value) the following minimum testing requirements must be adhered to.

  • Training Requirements Grantee will: A. Authorize and require staff (including volunteers) to attend training, conferences, and meetings as directed by DSHS. B. Appropriately budget funds to meet training requirements in a timely manner, and ensure staff and volunteers are trained as specified in the training requirements listed at ▇▇▇▇▇://▇▇▇.▇▇▇▇.▇▇▇▇▇.▇▇▇/hivstd/training/ and as otherwise specified by DSHS. Grantee shall document that these training requirements are met. C. Follow the appropriate DSHS POPS by funding opportunity (as per Section I: General Requirements for All Grantees) for training and observation requirements.

  • Forecasting Requirements 19.5.1 The Parties shall exchange technical descriptions and forecasts of their Interconnection and traffic requirements in sufficient detail necessary to establish the Interconnections necessary for traffic completion to and from all Customers in their respective designated service areas.

  • Operating Requirements Any operating and technical requirements that may be applicable due to Regional Transmission Organization, Independent System Operator, control area, or the Connecting Transmission Owner’s requirements, including those set forth in the Small Generator Interconnection Agreement. Operating Requirements shall include Applicable Reliability Standards.