MONITORING RESULT. 4.3.1 The monitoring results for the monitoring stations showed in Table 4.1 are reported in the monthly EM&A Report prepared for Contract No. HY/2013/01. During December 2017, there were 13 action level exceedances of suspended solid. The following table summarized the number of exceedance on each sampling data. 4.3.2 Since the removal of temporary loading and unloading point by Contract No. HY/2013/02, which involved marine work, was completed on 10 September 2017 and the area was handed back to Reclamation Contractor with Contract No. HY/2010/02 on 11 September 2017 for subsequent seawall construction as confirmed by RSS, there was no marine works or barge of this Contract worked at HKBCF reclamation site near the sea area or area near the monitoring station under Contract No. HY/2013/02 during December 2017. Hence, no investigation report was provided for all exceedances recorded under Contract No. HY/2013/02 in December 2017.There was no Action and Limit Level exceedance recorded on other monitoring date at the monitoring stations showed at Table 4.1 by the Environmental Team of Contract No. HY/2013/01 during the reporting period. 4.3.3 Although the exceedances were not relevant to this Contract, the Contractor was reminded to provide appropriate water pollution mitigation measures, such as ensure all construction activities that would deteriorate the water quality was collected by sedimentation tanks or package treatment systems for proper treatment prior to disposal.
Appears in 2 contracts
Sources: Environmental Monitoring & Audit Report, Environmental Monitoring & Audit Report
MONITORING RESULT. 4.3.1 The monitoring results for the monitoring stations showed in Table 4.1 are reported in the monthly EM&A Report prepared for Contract No. HY/2013/01. During December 2017September 2018, there were 13 153 action level exceedances and 29 limit level exceedance of dissolved oxygen and 2 action level exceedance of suspended solidsolids. The following table summarized the number of exceedance on each sampling data.
4.3.2 Since the removal of temporary loading and unloading point by Contract No. HY/2013/02, which involved marine work, was completed on 10 September 2017 and the area was handed back to Reclamation Contractor with Contract No. HY/2010/02 on 11 September 2017 for subsequent seawall construction as confirmed by RSS, there was no marine works or barge of this Contract worked at HKBCF reclamation site near the sea area or area near the monitoring station under Contract No. HY/2013/02 during December 2017September 2018. Hence, no specific investigation report was provided shall be referred to other ET’s report(s) under the HZMB Projects in which the respective contract(s) with remaining marine works on- going for all the exceedances recorded under Contract Noin water quality monitoring during this reporting month. HY/2013/02 in December 2017.There There was no Action and Limit Level exceedance recorded on other monitoring date at the monitoring stations showed at Table 4.1 by the Environmental Team of Contract No. HY/2013/01 during the reporting period.
4.3.3 Although the exceedances were not relevant to this Contract, the Contractor was reminded to provide appropriate water pollution mitigation measures, such as ensure all construction activities that would deteriorate the water quality was collected by sedimentation tanks or package treatment systems for proper treatment prior to disposal.
Appears in 1 contract
MONITORING RESULT. 4.3.1 The monitoring results for the monitoring stations showed in Table 4.1 are reported in the monthly EM&A Report prepared for Contract No. HY/2013/01. During December 2017July 2018, there were 13 39 action level exceedances and 18 limit level exceedance of dissolved oxygen, 1 action level exceedance of turbidity and 6 action level exceedance of suspended solid. The following table summarized the number of exceedance on each sampling data.. Sampling Date No. of Exceedances
4.3.2 Since the removal of temporary loading and unloading point by Contract No. HY/2013/02, which involved marine work, was completed on 10 September 2017 and the area was handed back to Reclamation Contractor with Contract No. HY/2010/02 on 11 September 2017 for subsequent seawall construction as confirmed by RSS, there was no marine works or barge of this Contract worked at HKBCF reclamation site near the sea area or area near the monitoring station under Contract No. HY/2013/02 during December 2017July 2018. Hence, no specific investigation report was provided shall be referred to other ET’s report(s) under the HZMB Projects in which the respective contract(s) with remaining marine works on-going for all the exceedances recorded under Contract Noin water quality monitoring during this reporting month. HY/2013/02 in December 2017.There There was no Action and Limit Level exceedance recorded on other monitoring date at the monitoring stations showed at Table 4.1 by the Environmental Team of Contract No. HY/2013/01 during the reporting period.
4.3.3 Although the exceedances were not relevant to this Contract, the Contractor was reminded to provide appropriate water pollution mitigation measures, such as ensure all construction activities that would deteriorate the water quality was collected by sedimentation tanks or package treatment systems for proper treatment prior to disposal.
Appears in 1 contract