Mono Tunnels Sample Clauses

Mono Tunnels. Export passes from West Portal to East Portal through the Mono Craters Tunnel. Discuss in detail the operations, maintenance, and monitoring procedures.

Related to Mono Tunnels

  • Sites 11.1 To enable Digital Origin to fulfill its obligations under any Contract: 11.1.1 the Client shall permit or procure permission for Digital Origin and any other person(s) authorised by Digital Origin to have reasonable access to the Client’s Sites, Equipment and/or Leased Equipment and any other relevant telephone system and other equipment and shall provide such reasonable assistance as Digital Origin requests. 11.1.2 Digital Origin will normally carry out work by appointment and during Normal Working Hours but may request the Client to (and the Client shall) provide access at other times. In the event that the Client cancels, reschedules or misses any pre-arranged appointment, it shall be liable to Digital Origin for any costs and expenses which Digital Origin incurs as a result of such cancellation, rescheduling and/or missed appointment. 11.2 At the Client’s request, Digital Origin may agree (at its sole discretion) to work outside Normal Working Hours and the Client shall pay Digital Origin’s reasonable charges for complying with such a request. 11.3 The Client warrants, represents and undertakes that it has adequate health and safety provisions in place at its Sites. 11.4 The Client shall procure all consents, licences and permissions necessary from landlords or other third parties for the carrying out of preparation work, installation of Equipment and/or Leased Equipment and for the provision, use and operation of the Equipment and/or Leased Equipment and/or Services at the Sites (save to the extent Digital Origin has agreed in writing to do it). 11.5 In the event that the Client is not able to procure the necessary consent to provide the Services within ninety days of the Connection Date Digital Origin will be able to terminate the Contract forthwith by giving the Client written notice without any liability. If the Client has not managed to procure the necessary consents and Digital Origin has commenced work the Client shall, on request by Digital Origin, refund to Digital Origin the cost of all such work (including, without limitation, staff costs and equipment costs) of an amount no less than £500 as Early Termination Charges. 11.6 The Client shall provide Digital Origin with the site and building plans (to include full details of all internal cabling runs) of the Sites and provide Digital Origin with full details of all other services in the vicinity of the proposed works. 11.7 The Client is responsible for making the Site good after any work undertaken by Digital Origin at a Site, including without limitation replacing and re-siting items and for re-decorating. 11.8 If the Client is moving a Site, Digital Origin must be informed as soon as is reasonably practicable so that suitable arrangements can be made to transfer the Client’s Services and Equipment and/or Leased Equipment. Unless otherwise requested, Digital Origin, in addition to moving the Service and Equipment and/or Leased Equipment, will also endeavour (but cannot guarantee that it will be able, for example where the Client moves to a different exchange) to retain the Client’s relevant existing telephone number(s). If Digital Origin can transfer the Client’s existing number(s) to the new Site the existing Contract will continue under the same terms and conditions. If Digital Origin cannot transfer the Client’s existing number(s) to the new Site, installation of a new line will be required at the new Site, or if the Client requires any additional new lines, this will attract new line connection charges and a new Contract. 11.9 If the new installation or moving Site involves the visit of an engineer to facilitate the new installation the Client will be responsible for the costs incurred by Digital Origin for the appointment together with an administration fee in respect of any additional works required to be undertaken by Digital Origin to complete the transfer of the Services and Equipment and/or Leased Equipment. 11.10 If the Client moves Sites and leaves the Equipment and/or Leased Equipment for the new owner/tenant the Client is required to inform them that the Service will be discontinued if Digital Origin is not contacted by the new owner/tenant within 72 hours for the purpose of entering into a new contract with Digital Origin for such services and subject in any event to the agreement of such a contract. 11.11 If at the new Site the Client receives services from an alternative supplier the Client is responsible for any contractual agreement the Client has with them and any liabilities the Client may incur for terminating such agreement.

  • Dewatering (a) Where the whole of a site is so affected by surface water following a period of rain that all productive work is suspended by agreement of the Parties, then dewatering shall proceed as above with Employees so engaged being paid at penalty rates as is the case for safety rectification work. This work is typically performed by Employees engaged within CW1, CW2 or CW3 classifications. When other Employees are undertaking productive work in an area or areas not so affected then dewatering will only attract single time rates. (b) Where a part of a site is affected by surface water following a period of rain, thus rendering some areas unsafe for productive work, consistent with the Employer’s obligations under the OH&S Act, appropriate Employees shall assist in the tidying up of their own work site or area if it is so affected. Where required, appropriate Employees will be provided with the appropriate PPE. Such work to be paid at single time rates. Productive work will continue in areas not so affected. (c) To avoid any confusion any ‘dewatering’ time which prevents an Employee from being engaged in their normal productive work is not included in any calculation for the purposes of determining whether an Employee is entitled to go home due to wet weather (refer clauses 32.4 and 32.5)

  • Pipelines Developer shall have no interest in the pipeline gathering system, which gathering system shall remain the sole property of Operator or its Affiliates and shall be maintained at their sole cost and expense.

  • Drainage Systems (1) Clear culvert inlets, outlets, and sediment catching basins. (2) Maintain waterbars, drainage dips, and other water diversion measures. (3) During active use, patrol and maintain functional drainage. (4) Repair damaged culvert ends.

  • Crane Erection & Jumping (a) Cranes and man/material hoists may be erected, altered, climbed and dismantled during times when ordinary production works are in progress subject to the work being done in full compliance with a relevant operational safety zone (OSZ) plan which has been developed specifically for that operation with consideration to overall site safety. (b) The crane crew for each tower crane (Crane Crew) must consist of the following: (i) crane driver; and (ii) three (3) dogmen. (c) In addition to the appropriate tickets held by the crane driver and the dogmen, the following high risk licences must be held amongst the Crane Crew: (i) rigging; and (ii) material handling. (d) Where a Project consists of a single Crane Crew, the Employer should endeavour to ensure another member of the Crane Crew holds a crane driver licence.