Multiple Permits May Be Required Sample Clauses

The "Multiple Permits May Be Required" clause informs parties that more than one permit or approval may be necessary to proceed with a project or activity. In practice, this means that before starting work, the responsible party must identify and obtain all relevant permits from various governmental or regulatory bodies, such as building, environmental, or zoning permits. This clause ensures that all legal and regulatory requirements are met, helping to prevent project delays, fines, or legal complications due to missing approvals.
Multiple Permits May Be Required. A land useuseuse authorized through the approval of an Administrative Permit, Temporary Use Permit, or Conditional/Minor Use Permit may also require a Design Review Permit, building permit, and/or other permit(s) required by the County Code.
Multiple Permits May Be Required. A land use authorized through the approval of an Administrative Permit, Temporary Use Permit, or Conditional/Minor Use Permit

Related to Multiple Permits May Be Required

  • Prior Procedure Required No grievance shall be considered by the arbitrator which has not been first duly processed in accordance with the grievance procedure and appeal provisions.

  • Unbundled Loop Modifications (Line Conditioning 2.5.1 Line Conditioning is defined as routine network modification that BellSouth regularly undertakes to provide xDSL services to its own customers. This may include the removal of any device, from a copper Loop or copper Subloop that may diminish the capability of the Loop or Subloop to deliver high-speed switched wireline telecommunications capability, including xDSL service. Such devices include, load coils, excessive bridged taps, low pass filters, and range extenders. Excessive bridged taps are bridged taps that serves no network design purpose and that are beyond the limits set according to industry standards and/or the BellSouth’s TR 73600 Unbundled Local Loop Technical Specification. 2.5.2 BellSouth will remove load coils only on copper Loops and Subloops that are less than eighteen thousand (18,000) feet in length. 2.5.3 For any copper loop being ordered by NewPhone which has over six thousand (6,000) feet of combined bridged tap will be modified, upon request from NewPhone, so that the loop will have a maximum of six thousand (6,000) feet of bridged tap. This modification will be performed at no additional charge to NewPhone. Loop conditioning orders that require the removal of bridged tap that serves no network design purpose on a copper Loop that will result in a combined total of bridged tap between two thousand five hundred (2,500) and six thousand (6,000) feet will be performed at the rates set forth in Exhibit A. 2.5.4 NewPhone may request removal of any unnecessary and non-excessive bridged tap (bridged tap between zero (0) and two thousand five hundred (2,500) feet which serves no network design purpose), at rates pursuant to BellSouth’s SC Process as mutually agreed to by the Parties. 2.5.5 Rates for ULM are as set forth in Exhibit A. 2.5.6 BellSouth will not modify a Loop in such a way that it no longer meets the technical parameters of the original Loop type (e.g., voice grade, ADSL, etc.) being ordered. 2.5.7 If NewPhone requests ULM on a reserved facility for a new Loop order, BellSouth may perform a pair change and provision a different Loop facility in lieu of the reserved facility with ULM if feasible. The Loop provisioned will meet or exceed specifications of the requested Loop facility as modified. NewPhone will not be charged for ULM if a different Loop is provisioned. For Loops that require a DLR or its equivalent, BellSouth will provide LMU detail of the Loop provisioned. 2.5.8 NewPhone shall request Loop make up information pursuant to this Attachment prior to submitting a service inquiry and/or a LSR for the Loop type that NewPhone desires BellSouth to condition. 2.5.9 When requesting ULM for a Loop that BellSouth has previously provisioned for NewPhone, NewPhone will submit a SI to BellSouth. If a spare Loop facility that meets the Loop modification specifications requested by NewPhone is available at the location for which the ULM was requested, NewPhone will have the option to change the Loop facility to the qualifying spare facility rather than to provide ULM. In the event that BellSouth changes the Loop facility in lieu of providing ULM, NewPhone will not be charged for ULM but will only be charged the service order charges for submitting an order.

  • Consents Required A complete list of all agreements wherein consent to the transaction herein contemplated is required to avoid a default thereunder; or where notice of such transaction is required at or subsequent to closing, or where consent to an acquisition, consolidation, or sale of all or substantially all of the assets is required to avoid a default thereunder. (Schedule F.)

  • No Required Sale Nothing in this Agreement shall be deemed to create an independent obligation on the part of any Holder to sell any Registrable Securities pursuant to any effective registration statement.

  • Certain Notice Requirements From and after the consummation of the IPO, an Investor Group (for purposes of this Section 4.3, a “Notifying Investor Group”) shall provide the other applicable Investor Group with written notice prior to the time that such Notifying Investor Group acquires, during any twelve (12) month period following the consummation of the IPO, Beneficial Ownership of an aggregate amount of Shares in excess of nine-tenths of a percent (0.90%) of the aggregate amount of issued and outstanding Shares.