NEO Propulsion Systems Sample Clauses

The "NEO Propulsion Systems" clause defines the terms and conditions related to the use, supply, or integration of NEO-branded propulsion systems within the scope of the agreement. This clause typically outlines the technical specifications, performance standards, and any proprietary requirements associated with these propulsion systems, as well as the responsibilities of each party regarding installation, maintenance, or support. Its core function is to ensure that all parties have a clear understanding of the expectations and obligations concerning NEO propulsion systems, thereby reducing the risk of disputes and ensuring consistent performance standards.
NEO Propulsion Systems. (i) Each A319 NEO Airframe will be equipped with a set of two (2) ▇▇▇▇▇ & ▇▇▇▇▇▇▇ PW1124G-JM engines, with an AET of 24,500 lbf. (such set, upon selection, an "A319 NEO Propulsion System"). (ii) Each A320 NEO Airframe will be equipped with a set of two (2) ▇▇▇▇▇ & ▇▇▇▇▇▇▇ PW1127G-JM engines, with an AET of 26,800 lbf. (such set, upon selection, an "A320 NEO Propulsion System"). (iii) Each A321 NEO Airframe will be equipped with a set of two (2) ▇▇▇▇▇ & ▇▇▇▇▇▇▇ PW1133G-JM engines, with an AET of 32,700 lbf. (such set, upon selection, an "A321 NEO Propulsion System")."
NEO Propulsion Systems. Clause 2.3.3 of the Agreement is deleted in its entirety and replaced with the following quoted text: QUOTE
NEO Propulsion Systems. The Airframe of the NEO Aircraft shall be equipped with a set of either two (2) CFM LEAP-X engines or two (2) ▇▇▇▇▇ & ▇▇▇▇▇▇▇ PW1100G engines, upon selection referred to respectively the “NEO Propulsion Systems”. A319 NEO PW1124G ***** LEAP-X 1A24 ***** A320 NEO PW1127G ***** LEAP-X 1A26 ***** A321 NEO PW1133G ***** LEAP-X 1A32 ***** ***** If the Buyer has not selected the NEO Propulsion Systems as of the date of this Amendment No.9, such choice shall be made ***** VOI A320 Family PA - AMDT 9 – Ref. D11032737 - December 2011 9/53
NEO Propulsion Systems. Aircraft Type ▇▇▇▇▇ & ▇▇▇▇▇▇▇ CFM

Related to NEO Propulsion Systems

  • Engine A. Any internal repairs or replacement of internal components, or replacement of engine assembly.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5. 1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Network Interconnection Methods 3.1 The Interconnection provided herein may not be used solely for the purpose of originating a Party’s own interexchange traffic.

  • Engines POSITION SERIAL NO. TOTAL HOURS TOTAL CYCLES HRS/CYCLES SINCE LAST SHOP VISIT Time Remaining to Next LIFE LIMITED PART REMOVAL PART NAME HOURS CYCLES MSN MSN

  • Interconnection Service Interconnection Service allows the Interconnection Customer to connect the Large Generating Facility to the Participating TO’s Transmission System and be eligible to deliver the Large Generating Facility’s output using the available capacity of the CAISO Controlled Grid. To the extent the Interconnection Customer wants to receive Interconnection Service, the Participating TO shall construct facilities identified in Appendices A and C that the Participating TO is responsible to construct.