No Deviation Request Required Sample Clauses

No Deviation Request Required. No deviation is necessary for omitting “Required as Applicable” standard provisions that are not required by the prescription or alternate versions of the mandatory provisions that are not applicable to a particular agreement. However, any omissions of or changes to mandatory or obligatory “Required as Applicable” standard provisions do require a deviation. No deviation is necessary to negotiate schedule terms or include special provisions in the agreement if they do not substantially alter existing requirements.
No Deviation Request Required. No deviation is necessary for omitting “Required as Applicable” standard provisions that are not required by the prescription or alternate versions of the mandatory provisions that are not applicable to a particular agreement. However, any omissions of or changes to mandatory or obligatory “Required as Applicable” standard provisions do require a deviation. No deviation is necessary to negotiate schedule terms or include special provisions in the agreement if they do not substantially alter existing requirements. See ADS 308mag, Sample Action Memorandum Template for a Deviation Request.‌‌ ● Applicable authority under the FAA, ● The AO’s determination that the type of agreement selected is the most appropriate, ● Inclusion of appropriate provisions, ● Compliance with notification requirements, ● Activity approval documentation, and ● Confirmation that due diligence has been completed through the OCR, project design, and related processes.

Related to No Deviation Request Required

  • Construction Requirements (a) All Life and Safety and applicable Building Codes will be strictly enforced (i.e., tempered glass, fire dampers, exit signs, smoke detectors, alarms, etc.). Prior coordination with the Building Manager is required. (b) Electric panel schedules must be brought up to date identifying all new circuits added. (c) All electrical outlets and lighting circuits are to be properly identified. Outlets will be labeled on back side of each cover plate. (d) All electrical and phone closets being used must have panels replaced and doors shut at the end of each day’s work. Any electrical closet that is opened with the panel exposed must have a work person present. (e) All electricians, telephone personnel, etc. will, upon completion of their respective projects, pick up and discard their trash leaving the telephone and electrical rooms clean. If this is not complied with, a clean-up will be conducted by the building janitors and the general contractor will be back-charged for this service. (f) Welding or burning with an open flame will not be done without prior approval of the Building Manager. Fire extinguishers must be on hand at all times. (g) All “anchoring” of walls or supports to the concrete are not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (h) All core drilling is not to be done during normal working hours (7:30 AM—6:00 PM, Monday through Friday). This work must be scheduled before or after these hours during the week or on the weekend. (i) All HVAC work must be inspected by the Building Engineer. The following procedures will be followed by the general contractor: [***] = CONFIDENTIAL INFORMATION HAS BEEN OMITTED AND FILED SEPARATELY WITH THE SECURITIES AND EXCHANGE COMMISSION. CONFIDENTIAL TREATMENT HAS BEEN REQUESTED WITH RESPECT TO THIS OMITTED INFORMATION. (i) A preliminary inspection of the HVAC work in progress will be scheduled through the Building Office prior to the reinstallation of the ceiling grid. (ii) A second inspection of the HVAC operation will also be scheduled through the Building Office and will take place with the attendance of the HVAC contractor’s Air Balance Engineer. This inspection will take place when the suite in question is ready to be air-balanced. (iii) The Building Engineer will inspect the construction on a periodic basis as well. (j) All existing thermostats, ceiling tiles, lighting fixtures and air conditioning grilles shall be saved and turned over to the Building Engineer.

  • Documentation Required The certificates and endorsements shall be received and approved by the District before Work commences. As an alternative, the Contractor may submit certified copies of any policy that includes the required endorsement language set forth herein.

  • Completion of a Utilisation Request (a) Each Utilisation Request is irrevocable and will not be regarded as having been duly completed unless: (i) the proposed Utilisation Date is a Business Day within the Availability Period; (ii) the currency and amount of the Utilisation comply with Clause 5.3 (Currency and amount); and (iii) the proposed Interest Period complies with Clause 10 (Interest Periods). (b) Only one Loan may be requested in each Utilisation Request.

  • Notification Requirement Through and up to the conclusion of the Non-Competition Period, Executive shall give notice to the Company of each new business activity he plans to undertake, at least seven (7) days prior to beginning any such activity. Such notice shall state the name and address of the Person for whom such activity is undertaken and the nature of Executive’s business relationship(s) and position(s) with such Person.

  • Installation requirements As may be further described and set forth in the Scope of services, all installation, integration, and other potentially public works construction activities which may be contemplated by Contractor, shall be performed in accordance with all applicable, laws, rules, and regulations of the District.