Common use of Non-Synchronous Generation Clause in Contracts

Non-Synchronous Generation. Developer shall design the Large Generating Facility to maintain composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging,

Appears in 54 contracts

Sources: Generator Interconnection Agreement, Service Agreement, Service Agreement

Non-Synchronous Generation. Developer shall design the Large Generating Facility to maintain composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging,to

Appears in 10 contracts

Sources: Large Generator Interconnection Agreement, Engineering, Procurement, and Construction Agreement, Interconnection Agreement

Non-Synchronous Generation. Developer shall design the Large Generating Facility to maintain composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging,synchronous generators that have not yet executed a Facilities Study Agreement as of September 21, 2016.

Appears in 1 contract

Sources: Large Generator Interconnection Agreement

Non-Synchronous Generation. Developer shall design the Large Generating Facility to maintain composite power delivery at continuous rated power output at the high-side of the generator substation at a power factor within the range of 0.95 leading to 0.95 lagging,, unless the NYISO or the Transmission Owner in whose Transmission District the Large Generating Facility interconnects has established a different power factor range that applies to all non-synchronous generators in the Control Area or Transmission District (as applicable) on a comparable basis, in accordance with Good Utility Practice. This power factor range standard SERVICE AGREEMENT NO. 2487

Appears in 1 contract

Sources: Interconnection Agreement