ONSITE LESSOR MANAGEMENT Sample Clauses

The ONSITE LESSOR MANAGEMENT clause establishes the lessor’s right or obligation to provide management services at the leased premises. Typically, this means the lessor will have personnel or representatives present on-site to oversee property operations, maintenance, or tenant relations. This arrangement ensures that the property is managed efficiently and that any issues can be addressed promptly, ultimately supporting smooth day-to-day operations and maintaining the property’s value.
ONSITE LESSOR MANAGEMENT. The Lessor shall provide an onsite Building superintendent or a locally designated representative available to promptly respond to deficiencies, and immediately address all emergency situations.
ONSITE LESSOR MANAGEMENT. (APR 2011)‌ A. The Lessor shall provide an onsite Building superintendent or a locally designated representative available to promptly respond to deficiencies, and immediately address all emergency situations. B. This Building superintendent or representative shall be readily available to NOAA during normal business hours as defined in the lease and shall ensure any daily building issues are promptly addressed. These issues include but are not limited to: 1. Clean / mop entry ways 2. Clean up of any dry or wet spills (non-hazmat) 3. Unplug toilets 4. Replace damaged ceiling tiles 5. Replace light bulbs 6. Hang/remove signage / billboards.
ONSITE LESSOR MANAGEMENT. (APR 2011)

Related to ONSITE LESSOR MANAGEMENT

  • SITE MANAGEMENT We reserve the right, but not the obligation, to: (1) monitor the Site for violations of these Terms of Use; (2) take appropriate legal action against anyone who, in our sole discretion, violates the law or these Terms of Use, including without limitation, reporting such user to law enforcement authorities; (3) in our sole discretion and without limitation, refuse, restrict access to, limit the availability of, or disable (to the extent technologically feasible) any of your Contributions or any portion thereof; (4) in our sole discretion and without limitation, notice, or liability, to remove from the Site or otherwise disable all files and content that are excessive in size or are in any way burdensome to our systems; and (5) otherwise manage the Site in a manner designed to protect our rights and property and to facilitate the proper functioning of the Site.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • Workload Management 11.1 The parties to this Agreement acknowledge that Employees and management have a responsibility to maintain a balanced workload and recognise the adverse effects that excessive workloads may have on Employee/s and the quality of resident/client care. 11.2 To ensure that Employee concerns involving excessive workloads are effectively dealt with by Management the following procedures should be applied: (a) Step 1: In the first instance, Employee/s should discuss the issue with their immediate supervisor and, where appropriate, explore solutions. (b) Step 2: If a solution cannot be identified and implemented, the matter should be referred to an appropriate senior manager for further discussion. (c) Step 3: If a solution still cannot be identified and implemented, the matter should be referred to the Facility Manager for further discussion. (d) Step 4: The outcome of the discussions at each level and any proposed solutions should be recorded in writing and fed back to the effected Employees. 11.3 Workload management must be an agenda item at staff meetings on at least a quarterly basis. Items in relation to workloads must be recorded in the minutes of the staff meeting, as well as actions to be taken to resolve the workloads issue/s. Resolution of workload issues should be based on the following criteria including but not limited to: (a) Clinical assessment of residents’ needs; (b) The demand of the environment such as facility layout; (c) Statutory obligation, (including, but not limited to, work health and safety legislation); (d) The requirements of nurse regulatory legislation; (e) Reasonable workloads (such as roster arrangements); (f) Accreditation standards; and (g) Budgetary considerations. 11.4 If the issue is still unresolved, the Employee/s may advance the matter through clause 9 Dispute Resolution Procedure. Arbitration of workload management issues may only occur by agreement of the Employer and the Employee representative, which may include the union/s.

  • Property Management (a) Borrower shall (i) cause Manager to manage the Properties in accordance with the Management Agreement, (ii) diligently perform and observe all of the terms, covenants and conditions of the Management Agreement on the part of Borrower to be performed and observed, (iii) promptly notify Lender of any default under the Management Agreement of which it is aware, (iv) promptly deliver to Lender a copy of each financial statement, business plan, capital expenditures plan, report and estimate received by it under the Management Agreement, and (v) promptly enforce the performance and observance of all of the covenants required to be performed and observed by Manager under the Management Agreement in a commercially reasonable manner. If Borrower shall default in the performance or observance of any material term, covenant or condition of the Management Agreement on the part of Borrower to be performed or observed, then, without limiting Lender’s other rights or remedies under this Agreement or the other Loan Documents, and without waiving or releasing Borrower from any of its Obligations hereunder or under the Management Agreement, Lender shall have the right, but shall be under no obligation, to pay any sums and to perform any act as may be appropriate to cause all the material terms, covenants and conditions of the Management Agreement on the part of Borrower to be performed or observed. In no event shall the fee payable to Manager for any Interest Period exceed the Management Fee Cap for such Interest Period and in no event shall Borrower pay or become obligated to pay to Manager, any transition or termination costs or expenses, termination fees, or their equivalent in connection with the Transfer of a Property or the termination of the Management Agreement. (b) If any one or more of the following events occurs: (i) the occurrence of an Event of Default, (ii) Manager shall be in material default under the Management Agreement beyond any applicable notice and cure period (including as a result of any gross negligence, fraud, willful misconduct or misappropriation of funds), or (iii) Manager shall become insolvent or a debtor in any bankruptcy or insolvency proceeding, then Lender shall have the right to require Borrower to replace the Manager and enter into a Replacement Management Agreement with (x) a Qualified Manager selected by Borrower that is not an Affiliate of Borrower or (y) another property manager chosen by Borrower and approved by Lender; provided, that such approval shall be conditioned upon Borrower delivering a Rating Agency Confirmation as to such property manager. If Borrower fails to select a new Qualified Manager or a replacement Manager that satisfies the conditions described in the foregoing clause (y) and enter into a Replacement Management Agreement with such Person within sixty (60) days of Lender’s demand to replace the Manager, then Lender may choose the replacement property manager provided that such replacement property manager is a Qualified Manager or satisfies the conditions set forth in the foregoing clause (y).

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.