Operating Permit Clause Samples

The OPERATING PERMIT clause requires that a party, typically the tenant or operator, obtain and maintain all necessary governmental permits or licenses needed to legally operate their business or activities at the premises. This means the responsible party must ensure compliance with all applicable laws and regulations by securing the appropriate permits before commencing operations and keeping them valid throughout the lease term. The core function of this clause is to allocate responsibility for legal compliance, thereby protecting the property owner from liability and ensuring that the business operates lawfully.
Operating Permit. The Muskogee Generating Station is a major source under OAC 252:100-8 and has submitted an application to modify their existing Title V permit to incorporate the requirement to install controls determined to meet ▇▇▇▇. The Permit will contain the following specific conditions: 1. The boilers in EUG 3 are subject to the Best Available Retrofit Technology (BART) requirements of 40 CFR Part 51, Subpart P, and shall comply with all applicable requirements including but not limited to the following: [40 CFR §§ 51.300-309 & Part 51, Appendix Y] a. Affected facilities. The following sources are affected facilities and are subject to the requirements of this Specific Condition, the Protection of Visibility and Regional Haze Requirements of 40 CFR Part 51, and all applicable SIP requirements: OG&E Muskogee Generating Station BART Review January 15, 2010 b. Each existing affected facility shall install and operate the SIP approved BART as expeditiously as practicable but in no later than five years after approval of the SIP incorporating BART requirements. c. The permittee shall apply for and obtain a construction permit prior to modification of the boilers. If the modifications will result in a significant emission increase and a significant net emission increase of a regulated NSR pollutant, the applicant shall apply for a PSD construction permit. d. The affected facilities shall be equipped with the following current combustion control technology, as determined in the submitted BART analysis, to reduce emissions of NOx to below the emission limits below: i. Low-NOx Burners, ii. Overfire Air. e. The permittee shall maintain the controls (Low-NOx burners, overfire air, dry) and establish procedures to ensure the controls are properly operated and maintained. f. Within 60 days of achieving maximum power output from each affected facility, after modification or installation of BART, not to exceed 180 days from initial start-up of the affected facility the permittee shall comply with the emission limits established in the construction permit. The emission limits established in the construction permit shall be consistent with manufacturer’s data and an agreed upon safety factor. The emission limits established in the construction permit shall not exceed the following emission limits: EU ID# Point ID# NOx Emission Limit S02 Emission Limit Averaging Period EU ID# Point ID# PM10 EU ID# Point ID# S02 Emission Limit S02 Emission Limit Averaging Period g. Boiler operating da...
Operating Permit. The term “Operating Permit” means a Governmental Authorization required to own, lease, manage or operate a Structure.
Operating Permit. KPF will use all reasonable efforts to procure that the Operating Permit is granted to KPF in the name of KPF with effect from 1 January 2017 and to satisfy any and all conditions required to that effect such as the constitution of a financial guarantee, as may be required under French law. KPF shall initiate and implement all legally required steps, make full and accurate compulsory filings and applications with the relevant public authorities, execute all documents at its own expense and as soon as practically possible after the execution of this Amendment, in order to be granted the Operating Permit. KPF shall keep LYB regularly informed of the status of its contacts with the relevant public authorities with regard to its application for the Operating Permit. KPF shall bear the lead responsibility to obtain the Operating Permit, and LYB shall have the responsibility to provide all reasonable support to KPF that it may require for the grant of the Operating Permit. Each Party shall promptly inform the other if it becomes aware of anything that could result in the process for KPF to obtain the Operating Permit to be delayed or its application for the Operating Permit to be denied.
Operating Permit. This permit renewal has to do with aerial emissions of Nitrogen Oxides, and it has been found that emissions from this facility are well below thresholds for permitting requirements. The full permit is available for public review at the Crisfield Library, and notice will be published in the local paper. Comments or requests for public hearing will be taken 30 days from the notice of publication. A Clearinghouse Review was received for the 2018 Hazard Mitigation Grant Program/▇▇▇▇▇ Island Drainage Improvement Project (MD20190416-0282). ▇▇. ▇▇▇▇▇▇ recommended a C5 designation (It is consistent with our plans, programs, and objectives). A motion was made by Commissioner ▇▇▇▇▇▇▇▇ and seconded by Commissioner ▇▇▇▇▇▇▇ to submit a C5 designation for the 2018 Hazard Mitigation Grant Program/▇▇▇▇▇ Island Drainage Improvement Project. The motion carried unanimously. ▇▇. ▇▇▇▇▇▇ reviewed the Federal Energy Regulatory Commission’s notice of availability of the Environmental Assessment for the proposed Del-Mar Energy Pathway Project. This project is related to the natural gas project that will eventually extend to Somerset County. A request was received from ▇▇. ▇▇▇▇▇▇▇ ▇. ▇▇▇▇▇▇▇▇▇▇, Transit Director, Tri-County Council for the Lower Eastern Shore of Maryland for the transfer of funds, in the amount of $5,447.00 from Capital Equipment to go towards the purchase of a replacement vehicle. A motion was made by Commissioner ▇▇▇▇▇▇▇▇, and seconded by Commissioner ▇▇▇▇▇▇▇ to approve the transfer request in the amount of $5,447.00. The motion carried unanimously. Next, ▇▇. ▇▇▇▇▇▇ advised that during budget deliberations, the decision was made to increase boat slip fees annually by $25.00 for all marinas. Additionally, a discussion was held regarding electricity availability at ▇▇▇▇▇▇▇’▇ Cove Marina. Slips 1-27 did not previously provide electrical service; but is now available. A discussion was held, and it was decided that ▇▇▇▇▇▇▇’▇ Cove Marina will now be billed with electric being mandatory, as is done at the other marinas. However, it was decided that electricity will be off at vacant slips and turned on once the slip is leased. It should be noted that slips 1-27 cannot be turned off. Upon a motion made by Commissioner ▇▇▇▇▇▇▇▇, and seconded by Commissioner ▇▇▇▇▇▇▇, it carried unanimously to approve the increase to boat slip fees annually by $25.00 for all marinas for the upcoming billing as follows: Marina: Fee FY20: Deal Island $675.00 ▇▇▇▇▇▇▇'▇ Cove $625.00 (Vacant sli...
Operating Permit. The PM shall review Contractor's schedule and proposed procedures Request for Proposal Number - 02RFP002K Program and Construction Management Services for The Water Services Division Section II - Request for Proposal Exhibits The PM shall coordinate specified equipment and systems operation training. The PM shall conduct operations training planning meeting with the Contractor, Design Professional, the County and the Operator to discussed required procedures for training sessions, lessons plan requirements, scheduling restrictions, audiovisual needs. The PM shall review Contractor's submittals related to training sessions and coordinate with the County and Design Professional's review and approval of training material. The PM shall facilitate the proper execution of the training sessions and record the duration of each session and maintain for comparison to the specified requirements. The PM shall coordinate start-up of the facility with the County and the Operator. The PM shall assist the County in preparing and submitting documentation to governmental agencies, and accompanying governmental officials during inspection of the Project. The PM shall administer all warranty provisions for all equipment.

Related to Operating Permit

  • Building Permit The Owner shall pay for all permits. The Owner and AE shall be required to provide such information to the Permitting Authority as is necessary to obtain approval from the Permitting Authority to commence construction prior to beginning construction. The CM shall pull the Building Permit, and shall be responsible for delivering and posting the Building Permit at the Project Site prior to the commencement of construction. The Owner and AE shall fully cooperate with the CM when and where necessary.

  • PARKING PERMITS A. Must be obtained on the day of move in. B. Towing charges resulting from violations will be the responsibility of the RESIDENT. C. Any form of duplication of parking permits is a violation of the LEASE AGREEMENT, and may be grounds for eviction. Note: Refer to Resident Handbook for further detail.

  • Building Permits All building permits required for the construction of the Improvements have been obtained prior to the commencement of the construction of the Improvements and copies of same will be delivered to Lessor.

  • Access to Properties Subject to the rights of Tenants, Borrower shall permit agents, representatives and employees of Lender to inspect the Properties or any part thereof at reasonable hours upon reasonable advance notice.

  • Project 3.01. The Recipient declares its commitment to the objectives of the Project. To this end, the Recipient shall carry out the Project in accordance with the provisions of Article IV of the General Conditions.