Operational Report. (to be published as digital supplement to the Science Report in the Scientific Drilling Journal) Personnel The action targets Scientific objectives Preparations / Mobilizations/ Demobilizations Technical Operations description including e.g. Infrastructure at the location and drill site set up, Rig type and specifications of installed components (e.g. hook load capacity, drawworks, pumps, rotary table, power swivel, handling equipment), A summary of drilling and coring operations (incl. BHA´s, bits, core bits, core recovery, used mud systems, mud pressure, mud density and mud flow, ROP, WOB, RPM etc), A casing scheme and description of cementing operations, Description of problems encountered e.g. fishing operations, mud loss, breakouts and a Summary of progress and costs including a drill-time log and a depth vs. cost breakdown. Scientific Operations Inventory of Sample Material The Basic Data Sets Storage of Sample Material / Sampling Party Preliminary Scientific Assessment Conclusions Acknowledgements Glossary See example: The COSC-1 Operational Report (doi: 10.2312/ICDP.2015.002)
Appears in 3 contracts
Sources: Grant Agreement, Grant Agreement, Grant Agreement