Other Augments. 8.2.5.1 Other augments such as power requests that exceed current capacity ratings, additional bay spaces, SBC-13STATE bays, SBC-13STATE cable racks and/or cage expansions within Active Collocation Space different than described above will require the Collocator to submit an inquiry for quote. The price quote will contain the charges and the construction interval for that application. 8.2.5.1.1 The construction interval for these other augments will not exceed ninety (90) days. SBC-13STATE will work cooperatively with Collocator to negotiate a mutually agreeable construction interval for other augments not specifically provided for above. 8.2.5.1.2 The second fifty percent (50%) payment must be received by SBC-13STATE no later than one (1) week prior to the scheduled augment completion date. If all money has been received on the scheduled completion date, the Actual Point of Termination (APOT) Connections will be provided to the Collocator by SBC-13STATE. 8.2.5.1.3 During SBC-13STATE delivery interval, if engineering design work is complete, which includes asbestos removal, HVAC installation, filtration, floor loading, floor preparation, overhead racking placement, and one hundred percent (100%) of the non-recurring charges have been received by SBC-13STATE, Collocator and/or their SBC-13STATE Approved Tier 1 Vendor (s) may request SBC-13STATE to do work in parallel with SBC-13STATE throughout the remaining delivery interval. The Collocator must obtain an approved Method of Procedures (MOP) from SBC- 13STATE and follow SBC-13STATE’s Technical Publications for installation of equipment and facilities. Security Card requirements in Section 18.3.6 of this Appendix will apply.
Appears in 2 contracts
Sources: Interconnection Agreement, Interconnection Agreement