Other Parameters Clause Samples

Other Parameters. 1. Internal Development All internal development works (all internal roads, footpaths, water supply including overhead tank & distribution lines, electric distribution line, internal sewer line, STP/Biodigester with use of recycled water for flushing and plantation, drainage, rainwater harvesting structure, street lights, parks, plantation fire fighting system etc. and other community facilities) shall be done by the developer at his own cost and as per bye laws/town ship policy. 2 Lay out plan and building plan approval fee As per prevailing rules to be paid by the developer for the total area.
Other Parameters. The benchmark values of the parameters, other than electricity prices, used in our nu- ▇▇▇▇▇▇▇ application to determine the strike and payment of CCfDs are defined in Table 3. They were determined using data from Hydrogen Europe [2020a], Eurostat [2021] and RTE [2016]. 80% 0.328gCO2/MWh ρg es ρe a χ 50% 0 0
Other Parameters. Particulars Credit Facility- 1 Credit Facility- 2 Credit Facility- 3 Month & Year Opening Limit (Rs) Repayment/ Reduction (Rs) Closing Limit (Rs)
Other Parameters. Since IXC and E-NET will most likely require other additional information to evaluate this Agreement's performance, both sides will furnish other relevant information as deemed reasonably necessary to fulfill this Agreement.
Other Parameters. Based on the proposed activities described above the project team has built in flexibility to incorporate up to two additional sampling components should they be determined practical and valuable to validation methodology development. Should these additional components be incorporated, the project team would simply scale back the above described efforts to make resources available to perform the additional tasks.
Other Parameters. Performance targets for a range of product parameters are provided in the individual product data sheets, available on the Nextgen website. Nextgen provides no guarantees on product performance parameters, other than those mentioned specifically in this document.

Related to Other Parameters

  • Parameters In calculating the MtM Exposure for each Transaction, the following parameters are set on the Transaction Date: ▪ On-Peak Initial ▇▇▇▇ ▇▇▇▇▇ ▪ Off-Peak/On-Peak Price Ratio ▪ Off-Peak Initial ▇▇▇▇ ▇▇▇▇▇ ▪ MW-Measure: initial Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Off-Peak Estimated Energy Quantity Per MW-Measure for each of the twelve calendar months ▪ Number of awarded Tranches In calculating the MtM Exposure for each Transaction, the following parameters are set each Business Day subsequent to the Transaction Date: ▪ On-Peak Forward Price ▪ Off-Peak Forward Price ▪ Current Capacity PLC Per Tranche ▪ On-Peak Estimated Energy Quantity ▪ Off-Peak Estimated Energy Quantity Process to Update the On-Peak Initial Mark Prices and Off-Peak Initial Mark Prices on a Daily Basis On each Business Day subsequent to the Transaction Date, the Pricing Agent will contact four Reference Market-Makers to obtain price quotes for on-peak and off-peak energy for PJM Western Hub. The Pricing Agent may not rely upon quotes from Seller or any Affiliate of Seller. The updated mark for a month will be equal to the average mark for that month over all sources from which a quote is available. If a monthly quote is available from any source, only the monthly quote or monthly quotes shall be used. Where quotes provide a bid and ask, the average shall be used. Where a quote for an individual month is unavailable, but the month is quoted as part of a “packaged” quote (e.g., January 2011 is only available in the form of a January/February 2011 “packaged” quote or an annual quote): ▪ If the other month/months of the package quote is/are also unavailable, then the marks for all months of the package will be calculated by multiplying the packaged quote by the ratio of the corresponding month to the corresponding calculated package quote from the previous day. Example: There are no On-Peak quotes available on day X during the contract for July 2011 or August 2011. However, there is an On-Peak July/August 2011 packaged quote of $73.00/MWh available. The On-Peak marks from day X-1 for July 2011 and August 2011 were $73.50/MWh and $76.50/MWh respectively. The day X On-Peak mark for July 2011 is set at 73.00 * [73.50] / [( (73.50 * 352) + (76.50 * 336) ) / (352+336) ] = 73 * (73.50/ 74.97) = $71.57/MWh. The day X On-Peak mark for August 2011 is set at 73.00 * [76.50] / [( (73.50 * 352) + (76.50*336) ) / (352+336) ] = 73 * (76.50 / 74.97) = $74.49/MWh. ▪ If the other month/months of the package quote is/are available, then the mark for the month will be set such that the average of the month and the other month(s) (weighted for either the On-Peak Hours or Off-Peak Hours as applicable) equals the packaged quote (see calculation example below).

  • Specific Terms Whenever used in this Agreement, the following words and phrases, unless the context otherwise requires, shall have the following meanings:

  • CLOUD SPECIFIC TERMS AND CONDITIONS To the extent that Contractor has received an award for Lot 3, Cloud, the following terms and conditions apply to Lot 3, Cloud. For the duration of an Authorized User Agreement, the Cloud Solution shall conform to the Cloud Solution Manufacturer’s specifications, Documentation, performance standards (including applicable license duration, warranties, guarantees, Service Level Agreements, service commitments, and credits). Contractor is responsible for providing physical and logical security for all Data, infrastructure (e.g. hardware, networking components, physical devices), and software related to the services the Contractor is providing under the Authorized User Agreement. All Data security provisions agreed to by the Authorized User and Contractor within the Authorized User Agreement may not be diminished for the duration of the Authorized User Agreement without prior written agreement by the parties amending the Authorized User Agreement.

  • Specific Terms and Conditions To the extent that Contractor has received an award for Lot 4, Implementation Services, the following terms and conditions apply to Lot 4 Implementation Services. All Services covered under Lot 4 – Implementation Services must be performed within CONUS. An RFQ for this Lot will be awarded based on, and result in, a deliverable-based Statement of Work (SOW) which will be incorporated into an Authorized User Agreement. The RFQ will include but is not limited to: Authorized User timeframes; system integration requirements; and other risks that may affect the cost to the Authorized User. All responses to RFQs must include detailed price information, including but not limited to: hours required per title, cost per hour, etc. Travel, lodging and per diem costs must be itemized in the total quote and may not exceed the rates in the NYS OSC Travel Policy. More information can be found at ▇▇▇▇://▇▇▇.▇▇▇.▇▇▇▇▇.▇▇.▇▇/agencies/travel/travel.htm. All costs must be itemized and included in the Contractor’s quote. Article 17-B of the New York State Executive Law provides for more meaningful participation in public procurement by certified Service-Disabled Veteran-Owned Businesses (“SDVOB”), thereby further integrating such businesses into New York State’s economy. OGS recognizes the need to promote the employment of service-disabled veterans and to ensure that certified service-disabled veteran-owned businesses have opportunities for maximum feasible participation in the performance of OGS contracts. In recognition of the service and sacrifices made by service-disabled veterans and in recognition of their economic activity in doing business in New York State, Bidders are expected to consider SDVOBs in the fulfillment of the requirements of the Contract. Such participation may be as subcontractors or suppliers, as protégés, or in other partnering or supporting roles.

  • Product Specific Terms these terms apply to specific Products referenced in this section.