Other Proposed Development Projects. In addition to the construction of a Crosswind Runway project, the following additional projects are proposed and are expected to result in the full build-out of the Airport: a. Construction of nine (9) aircraft “T” hangars, approximately 275ft by 50ft each to house aircraft and accessory storage space, and associated taxi lanes. The County is proposing construction of the “T” Hangars in order to provide additional aircraft hangar space. The “T” Hangars protect aircraft from weathering. The County expects that the additional “T” Hangars will not induce additional use of the Airport by new patrons, but that they will be utilized by current Airport patrons. b. Maintenance and replacement of runway and taxiway lighting, signage, and PAPI/▇▇▇▇ systems; including conduits, cables, bases, power and control systems. c. R/W 6-24 Obstruction Removal, which includes tree topping (approx. 120 acres) and tree removal (approx. 17 acres). There is an ongoing requirement to remove obstructions to the navigable airspace for the existing Runway 6-24. Obstruction Removal refers to two types of disturbance, tree removal and tree topping. Obstruction Removal was performed during 1992 within the pine-oak forest at the southwest and northeast ends of Runway 6-24, which consisted solely of tree topping. The current project proposes more comprehensive compliance with the FAA FAR Part 77 requirements, identifying all recommended obstruction removal for existing facilities. FAR Part 77 identifies and defines FAA’s clearance requirements for civil airport imaginary surfaces including the primary, approach and transitional surfaces for all airport runways; d. Expansion of the apron west of the existing terminal building. The Apron Expansion to the West of the Existing Terminal is required to provide additional aircraft parking, improve aircraft circulation and reduce congestion within the existing active apron. e. A 500 foot extension/safety area improvement (“shift”) west of runway 6-24, in order to provide the required 1,000 square foot safety area between the runway and CR 530. The 500-Foot Shift will shift the runway 500 feet to the southwest to provide the required 1,000’ safety area between the Runway 24 end and Route 530 and is considered a safety improvement. The runway shift will move the landing/takeoff area 500 feet further southwest of County Route 530 and is intended to reduce the potential for a conflict with traffic along Route 530. This project necessarily includes sh...

Related to Other Proposed Development Projects

  • Development Budget Attached hereto as Exhibit "B" and incorporated herein by this reference is the Development Budget in an amount equal to $_____________. Owner acknowledges and represents that the attached Development Budget includes the total costs and expenses to acquire, develop, renovate and construct the Real Property and the Apartment Housing.

  • Development Plan document specifying the work program, schedule, and relevant investments required for the Development and the Production of a Discovery or set of Discoveries of Oil and Gas in the Contract Area, including its abandonment.

  • Design Development Phase 1.3.1 Based on the approved Schematic Design Documents, model(s) and any adjustments to the Program of Requirements, BIM Execution Plan or Amount Available for the Construction Contract authorized by the Owner, the Architect/Engineer shall prepare, for approval by the Owner and review by the Construction Manager, Design Development Documents derived from the model(s) in accordance with Owner’s written requirements to further define and finalize the size and character of the Project in accordance with the BIM Execution Plan, “Facility Design Guidelines” and any additional requirements set forth in Article 15. The Architect/Engineer shall review the Design Development documents as they are being modeled at intervals appropriate to the progress of the Project with the Owner and Construction Manager at the Project site or other location specified by Owner in the State of Texas. The Architect/Engineer shall utilize the model(s) to support the review process during Design Development. The Architect/Engineer shall allow the Construction Manager to utilize the information uploaded into Owner’s PMIS to assist the Construction Manager in fulfilling its responsibilities to the Owner. 1.3.2 As a part of Design Development Phase, Architect/Engineer shall accomplish model coordination, aggregation and “clash detection” to remove conflicts in design between systems, structures and components. Architect/Engineer shall utilize Owner’s PMIS to accomplish model coordination and collaborate with Construction Manager in the resolution of critical clashes identified by the Construction Manager. Architect/Engineer shall demonstrate and provide written assurance to Owner that conflicts/collisions between models have been resolved. 1.3.3 The Architect/Engineer shall review the Estimated Construction Cost prepared by the Construction Manager, and shall provide written comments. 1.3.4 Before proceeding into the Construction Document Phase, the Architect/Engineer shall obtain Owner’s written acceptance of the Design Development documents and approval of the mutually established Amount Available for the Construction Contract and schedule. 1.3.5 The Architect/Engineer shall prepare presentation materials including an animation derived from the model(s) as defined in “Facility Design Guidelines” at completion of Design Development and if so requested shall present same to the Board of Regents at a regular meeting where scheduled within the state. 1.3.6 The Architect/Engineer shall prepare preliminary recommended furniture layouts for all spaces where it is deemed important to substantiate the fulfillment of program space requirements, or to coordinate with specific architectural, mechanical and electrical elements. 1.3.7 Architect/Engineer shall assist the Owner, if requested, with seeking approval of the Project by the Texas Higher Education Coordinating Board (THECB). Such assistance shall include (i) the preparation of a listing of the rooms and square footages in the Project, and (ii) the preparation of project cost information, in accordance with THECB Guidelines. This information shall be provided at the completion of the Design Development Phase when requested by the Owner. The listing of rooms and square footages shall then be updated to reflect any changes occurring during construction and provided to the Owner at Substantial Completion. 1.3.8 At the completion of the Design Development Phase, or such other time as Owner may specify to Architect/Engineer, at Owner’s sole option and discretion, Owner will furnish Architect/Engineer with a Guaranteed Maximum Price proposal prepared by Construction Manager based upon the Design Development documents prepared by the Architect/Engineer and approved by the Owner. The Architect/Engineer shall assist the Owner and endeavor to further and advocate the Owner’s interests in Owner’s communications with the Construction Manager in an effort to develop a Guaranteed Maximum Price proposal acceptable to Owner, in Owner’s sole option and discretion. If the Owner does not accept the Construction Manager’s Guaranteed Maximum Price proposal, the Architect/Engineer shall participate with the Owner and Construction Manager in constructability reviews and shall revise the documents as necessary in order to reach an agreement. If the Construction Manager’s Guaranteed Maximum Price proposal exceeds the Schematic Design Phase Estimated Construction Cost prepared by, or otherwise accepted by the Construction Manager due to an increase in the scope of the Project caused by further development of the design documents by the Architect/Engineer to the extent that such could not be reasonably inferred by the Construction Manager from the Schematic Design documents, and Owner directs Architect/Engineer to revise the documents, the Architect/Engineer shall revise the documents at its own expense so that the Guaranteed Maximum Price proposal for constructing the Project shall not exceed the Owner’s Amount Available for the Construction Contract and any previously approved Estimated Construction Costs. If it is determined to be in the Owner’s best interest, instead of requiring the Architect/Engineer to revise the Drawings and Specifications, the Owner reserves the right to accept a Guaranteed Maximum Price proposal that exceeds the stipulated Amount Available for the Construction Contract. The Architect/Engineer shall analyze the final Guaranteed Maximum Price proposal document, together with its supporting assumptions, clarifications, and contingencies, and shall submit a detailed written analysis of the document to the Owner. Such analysis shall include, without limitation, reference to and explanation of any inaccurate or improper assumptions and clarifications. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the Owner’s rejection of the Guaranteed Maximum Price proposal is not due to a failure of the A/E to provide the services otherwise required herein. 1.3.9 After the Guaranteed Maximum Price has been accepted, the Architect/Engineer shall incorporate necessary revisions into the Design Development documents. The A/E will not be required to make revisions to the documents at its own expense under the provisions of this paragraph if the revisions are required as the result of inaccurate assumptions and clarifications made in the development of the Guaranteed Maximum Price proposal that are not due to a failure of the A/E to provide the services otherwise required herein.

  • Business Plan and Budget As soon as available, but in any event within sixty (60) days after the end of each fiscal year of the Borrower, an annual business plan and budget of the Borrower and its Subsidiaries on a Consolidated basis, including forecasts prepared by management of the Borrower, in form reasonably satisfactory to the Lender, of Consolidated balance sheets and statements of income or operations and cash flows of the Borrower and its Subsidiaries on a fiscal year basis and, in the case of such forecasted statements of income, on a fiscal quarterly basis for the immediately following fiscal year. As to any information contained in materials furnished pursuant to Section 6.02(f), the Borrower shall not be separately required to furnish such information under Section 6.01(a) or (b) above, but the foregoing shall not be in derogation of the obligation of the Borrower to furnish the information and materials described in Sections 6.01(a) and (b) above at the times specified therein.

  • Development Activities The Development activities referred to in item “b” of paragraph 3.1 include: studies and projects of implementation of the Production facilities; drilling and completion of the Producing and injection ▇▇▇▇▇; and installation of equipment and vessels for extraction, collection, Treatment, storage, and transfer of Oil and Gas. The installation referred to in item “c” includes, but is not limited to, offshore platforms, pipelines, Oil and Gas Treatment plants, equipment and facilities for measurement of the inspected Production, wellhead equipment, production pipes, flow lines, tanks, and other facilities exclusively intended for extraction, as well as oil and gas pipelines for Production Outflow and their respective compressor and pumping stations.