Over/Under Voltage. It shall be the responsibility of the Owner to provide adequate protection or safeguards to prevent damage to LES caused by over/under voltages originating in the Facility and to protect the Facility from inadvertent over/under voltage conditions originating from the LES electrical system. A-4.5. Synchronization The Owner shall provide adequate facilities for the proper synchronization of the Facility with LES service wires such that such synchronization is accomplished without causing undesirable currents, surges, or voltage dips on the LES electrical system. LES employs automatic reclosing on its system circuit breakers. A fault and the subsequent breaker trip and reclose can cause an out-of-phase condition to exist between LES and the Facility. Following a period of interruption, the proper resynchronization of the Facility shall be the responsibility of the Owner.