OVERSIZE. Where a roadway is required by the Manager, Development Engineering to be a divided Major Road / Arterial Standard in the case of residential roads and an undivided Major Road / Arterial Standard in the case of industrial roads, and is designated and approved as such on the Construction Drawings and approved by the Development Engineer, then the City shall pay the cost of the additional width and depth or equivalent construction design from the Developer Funded Infrastructure Stabilization Fund β Major Road Standard Oversize to the Developer of Record the cost of such extra width and depth at prices in accordance with the Unit Rate Schedule.
Appears in 2 contracts
Sources: Development Agreement, Development Agreement