Part List Format. The contractor shall prepare a separate or integral parts list for each assembly that requires a call-out of parts. The contractor will determine whether separate or integral parts lists are used. However, the entire drawing package will use a consistent parts list format, i.e., all separate or all integral. When Parts Lists are integral with the assembly drawings, the list shall contain, as a minimum, the following columns: a) Find Number b) Quantity Required c) Code Identification d) Part or Identifying Number e) Nomenclature or Item Description f) Specification
Appears in 2 contracts