Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool. b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion. c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed. d. Where the Authority fails to comply with clause 36.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed. e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract. f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 23 contracts
Sources: Contract for the Provision of Maintenance and Support, Contract, Contract for Psychological, Psychiatric and Therapeutic Services
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 15 contracts
Sources: Supply and Support Contract, Contract, Master Contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36.b and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 13 contracts
Sources: Contract, Provision of GPS Tracking System, Contract for in Service Support of Detector Special Purpose (Dsp34)
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 36b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a36a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36b and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 36c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the this Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 11 contracts
Sources: Viking Combined Support Contract, Provision of a Flight Tasking Management System, Provision of a Mission Aircrew Isr Operator Training
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 36b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a36a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 36c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the this Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 11 contracts
Sources: Provision of Df186 – Mod Data Framework, Manufacture and Supply Agreement, Supply of Operational Analysis Terms and Conditions
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-on- boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 3 contracts
Sources: Contract for Consultancy Services, Contract, Contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 36b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a36a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36b and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 36c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s 's obligations nor as a waiver of its rights and remedies under the this Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 3 contracts
Sources: Intelligent Ship Phase 3 Contract, Contract, Intelligent Ship Phase 3 Contract
Payment and Recovery of Sums Due.
a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 2 contracts
Sources: Ship for Trials and Autonomy Development Contract, Contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-boardingonboarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s 's obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 2 contracts
Sources: Contract for the Provision of Design and Integration Partner, Production and Installation Agreement
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.b and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 2 contracts
Sources: Manufacture, Supply and Delivery Agreement, Contract for Anti Vibration Systems
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boardingon -boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 2 contracts
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 thirty (30) days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Contract for Remote Observation and Surveillance Systems
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 36b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a36a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 36c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s 's obligations nor as a waiver of its rights and remedies under the this Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36.b and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Procurement and Support Contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract othercontract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 36b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. . Where the Contractor submits an invoice to the Authority in accordance with clause 36.a36a, the Authority will consider and verify that invoice in a timely fashion.
c. . The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. . Where the Authority fails to comply with clause 36.a 36a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 36c after a reasonable time has passed.
e. . The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s 's obligations nor as a waiver of its rights and remedies under the this Contract.
f. . Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Contract for Acquisition of Space
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s 's obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Contract for Simulator Support
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-on- boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Contract
Payment and Recovery of Sums Due. a. a) Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b 35.b the Contractor will be required to register their details (Supplier on-on - boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. b) Where the Contractor submits an invoice to the Authority in accordance with clause 36.a35.a, the Authority will consider and verify that invoice in a timely fashion.
c. c) The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. d) Where the Authority fails to comply with clause 36.a 35.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c 35.c after a reasonable time has passed.
e. e) The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. f) Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Sources: Support Contract
Payment and Recovery of Sums Due.
a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.
Appears in 1 contract
Payment and Recovery of Sums Due. a. Payment for Contractor Deliverables will be made by electronic transfer and prior to submitting any claims for payment under clause 36.b the Contractor will be required to register their details (Supplier on-boarding) on the Contracting, Purchasing and Finance (CP&F) electronic procurement tool.
b. Where the Contractor submits an invoice to the Authority in accordance with clause 36.a, the Authority will consider and verify that invoice in a timely fashion.
c. The Authority shall pay the Contractor any sums due under such an invoice no later than a period of 30 days from the date on which the Authority has determined that the invoice is valid and undisputed.
d. Where the Authority fails to comply with clause 36.a 36.b and there is undue delay in considering and verifying the invoice, the invoice shall be regarded as valid and undisputed for the purpose of clause 36.c after a reasonable time has passed.
e. The approval for payment of a valid and undisputed invoice by the Authority shall not be construed as acceptance by the Authority of the performance of the Contractor’s obligations nor as a waiver of its rights and remedies under the Contract.
f. Without prejudice to any other right or remedy, the Authority reserves the right to set off any amount owing at any time from the Contractor to the Authority against any amount payable by the Authority to the Contractor under the Contract or under any other contract with the Authority, or with any other Government Department.. `
Appears in 1 contract